Time limit rectification content table

Time interval


Field display

Deadline rectification content table
License number
Unit name
Industry category
Serial number
Rectify the problem
Corrective measures
Rectification time limit
Rectification plan
Have the rectification been completed

Sample data

License Number Unit name Industry category Serial number Rectify the problem Corrective measures Rectification time limit Rectification plan Whether the rectification is completed
12500000MB1G99780M001R Chongqing Fire Hospital General Hospital 1 Rectify the waste gas treatment facilities of the sewage treatment station The odor of the sewage treatment station is collected through pipelines, adsorbed and deodorized by activated carbon, and then discharged at high altitude through a 15m high exhaust pipe. 2022-12-31 to 2023-06-30 The odor of the sewage treatment station is collected through pipelines, adsorbed and deodorized by activated carbon, and then discharged at high altitude through a 15m high exhaust pipe.
12410000416307487B001R The First Affiliated Hospital of Henan University General Hospital 1 Incomplete procedures Failure to go through environmental impact assessment and acceptance procedures and make rectifications. 2020-08-05 to 2021-08-04 Within one year, the environmental impact assessment and acceptance procedures will be completed. Yes
12410000416307487B001R The First Affiliated Hospital of Henan University General Hospital 2 Incomplete procedures Failure to go through environmental impact assessment and acceptance procedures and make rectifications. 2021-08-30 to 2022-08-29 Within one year, the environmental impact assessment and acceptance procedures will be completed. Yes
12410000416307487B001R The First Affiliated Hospital of Henan University General Hospital 3 Others Sewage station flow online equipment, deodorization system and boiler low-nitrogen burner are not installed 2023-03-09 to 2023-05-31 Install sewage station flow online equipment, deodorization system and boiler low nitrogen burner No
92532801MA6KTPPF46001R Jinghong New Energy Waste Oil Recycling Plant Environmental hygiene management 1 No organized exhaust pipe is provided Change unorganized emissions into organized emissions within a time limit 2023-02-21 to 2023-08-21 Install an exhaust pipe no lower than 15 meters to conduct organized exhaust gas discharge.
9141020474253815XD001R Kaifeng Fushengxiang Food Industry Co., Ltd. Livestock slaughter 1 Nitrogen oxides cannot meet regulatory requirements. The boiler is equipped with a "low nitrogen combustion + flue gas circulation" device. 2019-05-31 to 2019-08-31 The rectification has been completed
9141020474253815XD001R Kaifeng Fushengxiang Food Industry Co., Ltd. Livestock slaughter 2 The odorous gas from the sewage station is currently being discharged unorganized and does not meet relevant requirements. Seal the sewage station and set up draft equipment to introduce the odorous gas into the activated carbon device for adsorption treatment and then discharge it through the 15m high exhaust pipe. 2019-05-31 to 2019-08-31 The rectification has been completed
9141020474253815XD001R Kaifeng Fushengxiang Food Industry Co., Ltd. Livestock slaughter 3 Other-no automatic monitoring equipment installed/used and connected to the Internet Install wastewater online monitoring equipment (monitoring factors are pH, COD, ammonia nitrogen) and connect to the Internet with the Environmental Protection Bureau 2023-02-16 to 2023-07-31 Complete the installation of wastewater online monitoring equipment (monitoring factors are pH, COD, ammonia nitrogen) according to the rectification time limit, and connect it to the Environmental Protection Bureau
9152062834713557X0004R Songtao County Yuguang No. 1 and No. 2 slag reservoir leachate treatment stations Electrolytic manganese 1 Incomplete procedures Failed to obtain environmental impact assessment procedures 2023-02-04 to 2024-02-03 Accelerate the process of environmental impact assessment and improve other related procedures
9152062834713557X0003R Songtao Miao Autonomous County Jingyu Environmental Protection Investment Co., Ltd. south manganese-related sewage centralized treatment station Sewage treatment and its recycling 1 Incomplete procedures Accelerate environmental impact assessment processing 2023-02-04 to 2024-02-03 Accelerate the process of environmental impact assessment and improve other related procedures
91410324MA3X5E26XJ001R Luanchuan County Kaiyuan Municipal Engineering Co., Ltd. Sewage treatment and its recycling 1 Other-no automatic monitoring equipment installed/used and connected to the Internet Install automatic online monitoring equipment at the water inlet and outlet of the sewage treatment plant as required, as well as the corresponding inspection content and pollution factors. 2023-01-17 to 2024-01-16 The installation and debugging of the self-monitoring equipment will be completed before the end of August 2023, and the networking with the monitoring centers of the Luoyang Municipal Ecological Environment Bureau and Luanchuan County Environmental Protection Bureau will be completed before the end of the year.
916301007105391310005R Dulan Branch of Qinghai Tianpu Weiye Environmental Protection Technology Co., Ltd. (Sewage Treatment Plant in Xiangride Town, Dulan County) Sewage treatment and its recycling 1 Other-no automatic monitoring equipment installed/used and connected to the Internet Complete the installation and acceptance of automatic online equipment as soon as possible 2023-01-05 to 2023-04-04 Complete rectification and changes within the prescribed time limit
91320322086977524U001R Jiangsu Dibang Construction Engineering Co., Ltd. Metal surface treatment and heat treatment processing 1 Environmental protection acceptance has not yet been completed Has signed an environmental impact assessment acceptance contract with Xinjiang Youjie Testing Co., Ltd. 2022-10-01 to 2023-06-30 An environmental impact assessment acceptance contract has been signed with Xinjiang Youjie Testing Co., Ltd., and the acceptance is expected to be completed before June 30, 2023
91500110321770022N001R National Energy Chongqing Power Plant Co., Ltd. Thermal power generation 1 Incomplete procedures After applying for a sewage discharge outlet permit, complete the relevant information about the sewage discharge permit. 2022-12-08 to 2023-02-28 /
91500110321770022N001R National Energy Chongqing Power Plant Co., Ltd. Thermal power generation 2 The temporary storage room for hazardous waste is not fully constructed Accelerate the construction of hazardous waste temporary storage rooms and properly store hazardous waste until it is completed. 2022-12-08 to 2023-04-30 /
914202220985319769002R Yangxin County Tianyuan Building Materials Co., Ltd. Building stone processing 1 The waste gas generated by the crushing and screening process is not discharged in an organized manner as required, and there are no pollution prevention and control measures Install bag dust collectors and exhaust pipes that meet specification requirements (not less than 15m) in the crushing equipment and screening equipment processes. The discharge ports are equipped with detection holes and environmental protection signs in accordance with specifications. After completion, a third-party testing agency will be entrusted to monitor the emission of various waste gas pollutants, and the implementation of pollution prevention and control facilities will be determined based on whether the standards are met. 2022-11-28 to 2023-11-27 Entrust third-party construction and complete rectification on schedule
914202220985319769002R Yangxin County Tianyuan Building Materials Co., Ltd. Building stone processing 2 The raw material storage yard is not equipped with three-sided enclosures and ceilings; the factory area and road floors are not hardened 1. Set up three-sided enclosures and ceilings in the raw material storage yard 2. Harden the factory area and roads 2022-11-28 to 2023-11-27 Entrust third-party construction and complete rectification on schedule
91522702MA7BY3P02Q001R Guizhou Phosphate New Material Technology Co., Ltd. Inorganic salt manufacturing 1 Others - Pollutant discharge outlets are not set up as required Constructed in strict accordance with the environmental impact assessment report approval requirements, the height of all organized waste gas emission outlets in this project will be increased to 30 meters, and a manual monitoring platform will be constructed in a standardized manner. 2022-10-20 to 2023-01-20 Complete the increase in height of all organized exhaust gas emission outlets to 30 meters before January 20, 2023, and standardize the construction of manual monitoring platforms.
91522702MA7BY3P02Q001R Guizhou Phosphate New Material Technology Co., Ltd. Inorganic salt manufacturing 2 Other-no automatic monitoring equipment installed/used and connected to the Internet In accordance with the requirements of the technical specifications for the application and issuance of pollution discharge licenses (Inorganic Chemical Industry), a continuous online flue gas monitoring system is added to the exhaust outlet of the calcination section and networked with the environmental authorities. 2022-10-20 to 2023-03-20 Before March 20, 2023, in accordance with the requirements of the technical specifications for the application and issuance of pollution discharge licenses (Inorganic Chemical Industry), a continuous online monitoring system for particulate matter shall be constructed at the exhaust outlet of the calcination section and networked with the environmental authorities.
91522702MA7BY3P02Q001R Guizhou Phosphate New Material Technology Co., Ltd. Inorganic salt manufacturing 3 Other questions Recalculate the total amount of particulate matter in the project and submit it to the ecological environment department for approval. Combine it with the pollution discharge permit accounting method, and finally compare it with the total amount after the change of certification by the administrative department, and strictly implement it. 2022-10-20 to 2023-01-20 Complete communication and negotiation with the ecological environment authorities before January 20, 2023, to resolve issues such as the total amount of particulate matter in the environmental impact assessment report and the implementation of the total amount of particulate matter in the pollution discharge permit.
91441823MA57CJP924001R Miyang Building Materials (Qingyuan) Co., Ltd. Paint manufacturing 1 No pollution prevention and control facilities installed According to regulations, the waste gas from the material storage, batching, mixing, stirring, dispersing, grinding, and packaging processes should be collected in a closed manner and treated with feasible technical pollution prevention and control facilities. 2022-11-08 to 2023-10-26 1. From now until August 1, 2023, in accordance with the industry self-monitoring technical specifications, pollution discharge license application and issuance technical specifications, etc., formulate an exhaust gas pollution control plan, build exhaust gas pollution control facilities, debug and put them into normal operation . 2. Submit the rectification report and pollution discharge license application materials before September 1, 2023. 3. Carry out self-monitoring in strict accordance with regulations.
91441823MA57CJP924001R Miyang Building Materials (Qingyuan) Co., Ltd. Paint Manufacturing 2 No sampling platform has been set up at the pollutant discharge outlet The exhaust gas discharge port DA001 builds a sampling platform in accordance with regulations. 2022-11-08 to 2023-04-26 1. In accordance with the "Technical Requirements for Standardized Regulation of Sewage Outlets (Trial)" (Environmental Supervision [1996] No. 470) and the "Notice on Issuing the Guidelines for the Standardized Setup of Pollution Source Sewage Outlets in Guangdong Province" (Guangdong Environmental Protection [2008] No. 42 ) and other regulations to build a sampling platform. 2. Submit the rectification report and pollution discharge license application materials before September 1, 2023.
91620725561109380P001R Shandan County Tianyi Quarry Building stone processing 1 Does not meet the requirements of current regulations Construct fully enclosed workshops and enclosed corridors, and all production equipment must be installed in closed workshops; 2022-09-30 to 2023-09-29 1. Prepare funds and determine the construction unit starting from October 2022. 2. Complete the construction of fully enclosed workshops, sealed corridors and solid waste storage rooms before November 15, 2022. 3. Complete the application for a pollution discharge license before September 30, 2023.
11622424015327348B002R domestic garbage landfill in Yigangchuan Town, Tongwei County Environmental hygiene management 1 Failure to set up groundwater monitoring wells in accordance with the "Pollution Control Standard for Domestic Waste Landfills" (GB16889-2008) According to the basic requirements for groundwater quality monitoring in 10.2 of the "Pollution Control Standard for Domestic Waste Landfills" (GB16889-2008), a background well is set up 30-50m upstream of the groundwater flow in the landfill area; A pollution diffusion well is set up 30-50m on both sides of the groundwater flow; a pollution monitoring well is set up 30m and 50m downstream of the groundwater flow from the landfill. 2022-09-21 to 2023-09-20 According to the rectification notice, apply for funds as soon as possible and set up five monitoring wells within the rectification time limit in accordance with the basic requirements for groundwater quality monitoring 10.2 of the "Pollution Control Standard for Domestic Waste Landfills" (GB16889-2008). Apply for a pollution discharge permit after the rectification is completed.
91331127MA28JEBU58001R Jingning Langjing Water Operations Management Co., Ltd. Sewage treatment and its recycling 1 Other-no automatic monitoring equipment installed/used and connected to the Internet According to the "Technical Specifications for Application and Issuance of Pollutant Discharge Licenses for Water Treatment (Trial)" HJ978-2018, urban sewage treatment plants and other domestic sewage treatment plants must set up automatic monitoring of the inlet main pipe flow, chemical oxygen demand, and ammonia nitrogen indicators. , the automatic monitoring data of the water inlet main pipe must be connected to the pollution source automatic monitoring system platform of the local ecological environment department. At present, there are no automatic monitoring facilities for ammonia nitrogen and chemical oxygen demand at the water inlet main pipe. Within the rectification time, automatic monitoring facilities for ammonia nitrogen and chemical oxygen demand will be added and networked with the superior authorities 2022-08-08 to 2023-08-07 Purchase and install automatic monitoring instruments within the rectification time limit, and connect them to the higher-level authorities
12370322493213580Y002R Gaoqing County Second People's Hospital (Gaoqing County Mental Health Center, Gaoqing County Rehabilitation and Nursing Center for Disabled Persons) General Hospital 1 Others Install automatic flow monitoring equipment at the wastewater discharge outlet 2022-09-05 to 2023-09-04 /
113305230025737262001R People's Government of Hanggai Town, Anji County Sewage treatment and its recycling 1 Other-no automatic monitoring equipment installed/used and connected to the Internet Self-monitoring is not connected to the Internet. Please complete debugging and connect to the Internet within the rectification time limit 2022-08-31 to 2022-11-30 Complete debugging and connect to the Internet within the rectification time limit
91370783MA3MWGY58G001R Shou Guangye Plastic Co., Ltd. Comprehensive utilization of waste resources 1 The setting of sewage outlets does not meet national and local requirements The company promises to complete the standardized rectification and acceptance of exhaust gas emission outlets within 2 months after obtaining the pollution discharge permit 2020-01-01 to 2020-03-01
91522702MAALQPQG0L001R Guizhou Yuneng New Energy Battery Materials Co., Ltd. Basic chemical raw material manufacturing 1 Other-no automatic monitoring equipment installed/used and connected to the Internet In accordance with the technical specifications for industry emission permit application and issuance, install automatic pollutant emission equipment and network with the ecological environment department. 2022-08-17 to 2023-08-16 On August 16, 2023, the installation of automatic pollutant discharge equipment will be completed and connected to the ecological environment department. No
113305236617130838001R Anji County Comprehensive Administrative Law Enforcement Bureau (Anji County Comprehensive Administrative Law Enforcement Brigade, Anji County Urban Management Bureau) Environmental hygiene management 1 Pollution prevention and control equipment is not installed in place Complete the installation of pollution prevention and control equipment and meet emission standards 2022-08-31 to 2022-12-31 Complete the installation of pollution prevention and control equipment within the rectification time limit and meet emission standards
91620702566438757D002R Zhangye Denghai Seed Industry Co., Ltd. Primary processing activities of agricultural products 1 Other-no automatic monitoring equipment installed/used and connected to the Internet Rectification measures (1) Ensure that funds and personnel are in place 1. Designate a dedicated person to be responsible, ensure that funds are in place, and ensure that tasks are carried out in a timely and smooth manner; 2. Actively cooperate with the winning bidder to carry out relevant work to ensure that the rectification plan is completed on schedule. (2) Ensure that the rectification tasks are completed on time and in strict accordance with the established time limit requirements to complete the rectification work at each stage, make various preparations as early as possible, and complete the rectification tasks according to the time limit requirements. After ensuring that the online monitoring facilities are installed on time, apply for a pollutant discharge permit on schedule. (3) Ensure that discharge standards are met during the rectification period 1. During the rectification period, strictly follow the requirements of the "Notice on Completing the Clearance and Rectification of Pollution Discharge Permits for Stationary Pollution Sources and the Issuance and Registration of Pollution Discharge Permits in 2020" to ensure that discharge standards are met. 2. Entrust a third-party testing agency to actively carry out self-monitoring and keep relevant records to ensure that emissions meet standards. 2022-08-25 to 2023-08-24 Zhangye Denghai Seed Industry Co., Ltd.’s rectification plan for the installation of online monitoring system for boiler pollutants Zhangye Ecological Environment Bureau Ganzhou Branch: Zhangye Denghai Seed Industry Co., Ltd. is located at 16 Oasis Avenue, Ganzhou District, Zhangye City, Gansu Province No. 2, two 25-ton circulating fluidized bed boilers were completed and put into operation in September 2012. It is specially used for the corn seed processing production line in September and October every year, and the heat source output of the drying production process. According to the requirements of the Ministry of Ecology and Environment's "Notice on Cleaning up and Rectifying the Pollution Discharge Permits of Stationary Pollution Sources and Issuing and Registration of Pollution Permits in 2020" (EIA Letter (2019) 939 from the Office of Environmental Protection) and "Notice on Matters Concerning the Time-limited Rectification of Pollution Discharge from Fixed Pollution Sources" , our unit failed to complete the installation of the boiler online monitoring system in time. In order to speed up the rectification of problems and successfully obtain the emission permit, based on the actual situation of our unit, the rectification plan is formulated as follows: 1. Rectification issues and time limits 1. Rectification issues: Flue gas emissions from two 25-ton circulating fluidized bed boilers were not completed as required. Installation of an online monitoring system for nitrogen oxide pollutants at the mouth; 2. Time limit for rectification: The above issues must be rectified before August 20, 2023. 2. Arrangements for the rectification system 1. Submit plans and demonstrate project approval by the end of 2022. 2. The headquarters project approval will be completed in March 2023. 3. Organize bidding in May 2023. 4. Implement the installation of the online monitoring system and complete the networking in June 2023. 5. Apply for a pollution discharge permit before August 20, 2023. 3. Rectification measures (1) Ensure that funds and personnel are in place 1. Designate a dedicated person to take charge, ensure that funds are in place, and ensure that tasks are carried out in a timely and smooth manner; 2. Actively cooperate with the winning bidder to carry out relevant work to ensure that the rectification plan is completed on schedule. (2) Ensure that the rectification tasks are completed on time and in strict accordance with the established time limit requirements to complete the rectification work at each stage, make various preparations as early as possible, and complete the rectification tasks according to the time limit requirements. After ensuring that the online monitoring facilities are installed on time, apply for a pollutant discharge permit on schedule. (3) Ensure that discharge standards are met during the rectification period 1. During the rectification period, strictly follow the requirements of the "Notice on Completing the Clearance and Rectification of Pollution Discharge Permits for Stationary Pollution Sources and the Issuance and Registration of Pollution Discharge Permits in 2020" to ensure that discharge standards are met. 2. Entrust a third-party testing agency to actively carry out self-monitoring and keep relevant records to ensure that emissions meet standards. 4. Other aspects During the rectification period, our unit strictly implemented the relevant regulations and requirements in accordance with the "Guidelines for Self-monitoring Technology of Sewage Discharge Units for Thermal Power Generation and Boilers" (HJ820-2017) and "Water Quality Standards for Sewage Discharge into Urban Sewers" (GB/T31962). Carry out self-monitoring, and the frequency of monitoring shall be as shown in Table 1. Table 1 Discharge outlet number Discharge outlet name Pollutant name (concentration limit) Monitoring implementation Manual monitoring frequency DA001 No. 1 boiler exhaust outlet flue gas blackness (level 1) manual once/month Nitrogen oxide (200mg/Nm3) manual once /Monthly sulfur dioxide (50mg/Nm3) manual once/month particulate matter (20mg/Nm3) manual once/month DA002 No. 2 boiler exhaust outlet flue gas blackness (level 1) manual once/month nitrogen oxide (200mg/Nm3) ) Manually once/month Sulfur dioxide (50mg/Nm3) Manually once/month Particulate matter (20mg/Nm3) Manually once/month
11621102013935710T003R People's Government of Guanying Town, Anding District, Dingxi City Sewage treatment and its recycling 1 Other-no automatic monitoring equipment installed/used and connected to the Internet In accordance with the self-monitoring requirements of the "Technical Specifications for Water Treatment for Application and Issuance of Pollution Discharge Licenses", automatic monitoring devices need to be installed for water inlet flow, chemical oxygen demand, and ammonia nitrogen of urban sewage treatment plants; urban sewage treatment plants have to install automatic monitoring devices for outlet flow, chemical demand Automatic monitoring devices need to be installed for oxygen, ammonia nitrogen, pH, water temperature, total phosphorus, and total nitrogen. 2022-08-24 to 2023-08-23 According to the rectification notice, apply for funds as soon as possible, and within the rectification time limit, according to the self-monitoring requirements of the "Technical Specifications for Water Treatment for Application and Issuance of Pollution Discharge Licenses", install at the water inlet of the sewage treatment plant based on flow, chemical oxygen demand, and ammonia nitrogen. The main automatic monitoring devices are connected to the Internet; the main automatic monitoring devices for flow, chemical oxygen demand, ammonia nitrogen, pH, water temperature, total phosphorus, and total nitrogen are installed and connected to the network at the main sewage outlet.
122323004146590751001R Suihua City Urban Appearance and Environmental Sanitation Service Center Environmental hygiene management 1 Other-no automatic monitoring equipment installed/used and connected to the Internet Water treatment automatic monitoring equipment is not installed 2022-08-03 to 2023-08-02 Install automatic monitoring equipment for water treatment and network with environmental managers
122323004146590751001R Suihua City Urban Appearance and Environmental Sanitation Service Center Environmental hygiene management 2 Incomplete procedures Failure to complete environmental impact assessment and acceptance procedures 2022-08-03 to 2023-08-02 Complete relevant environmental protection procedures within one year
122323004146590751001R Suihua City Urban Appearance and Environmental Sanitation Service Center Environmental hygiene management 3 The anti-seepage level and requirements do not comply with the "Pollution Control Standard for Domestic Waste Landfills" (GB16889-2008) and the environmental impact assessment approval The anti-seepage level and requirements do not comply with the "Pollution Control Standard for Domestic Waste Landfills" (GB16889-2008) and the environmental impact assessment approval 2022-08-03 to 2023-08-02 Within one year, the seepage prevention project must meet the requirements and comply with the "Pollution Control Standard for Domestic Waste Landfills" (GB16889-2008) and the environmental impact assessment approval requirements
122323004146590751001R Suihua City Urban Appearance and Environmental Sanitation Service Center Environmental hygiene management 4 Improvement Measures for Landfill Odor Control Improvement measures for landfill odor control should be taken within a time limit 2022-08-03 to 2023-08-02 Install qualified odor control measures within one year
91430426MA4Q92QLXR001R Hengyang Hongshengda New Energy Co., Ltd. Lithium-ion battery manufacturing 1 Solid waste disposal Hazardous waste must sign an agreement with a qualified hazardous waste disposal unit 2019-10-01 to 2019-12-30 No
91430426MA4Q92QLXR001R Hengyang Hongshengda New Energy Co., Ltd. Lithium-ion battery manufacturing 2 Unorganized emissions during the electrolyte injection process Increase organized processing facilities in the electrolyte injection process 2019-10-01 to 2019-12-30 No
91430426MA4Q92QLXR001R Hengyang Hongshengda New Energy Co., Ltd. Lithium-ion battery manufacturing 3 No test report Entrust a qualified unit to conduct testing 2019-09-30 to 2019-12-30 No
91321191321166693Q001R Zhenjiang Dadong Electronics Co., Ltd. Other electronic equipment manufacturing 1 Domestic sewage is not connected to the municipal sewage pipe network Because the local municipal sewage pipe network is not connected, the domestic sewage of the enterprise is temporarily treated in septic tanks and reused for irrigation of surrounding farmland. We are now committed to taking over the domestic sewage for treatment in a timely manner after the sewage pipe network is connected 2019-09-17 to 2020-09-17
91321191MA1MURUX7D001R Zhenjiang Aodong Electronics Co., Ltd. Other electronic equipment manufacturing 1 Domestic sewage is not connected to the municipal sewage pipe network Because the local municipal sewage pipe network is not connected, the domestic sewage of the enterprise is temporarily treated in septic tanks and reused for irrigation of surrounding farmland. We are now committed to taking over the domestic sewage for treatment in a timely manner after the sewage pipe network is connected 2019-09-18 to 2020-09-18
91621102MA744BPUX2001R Dingxi Kanghua Orthopedic Hospital Specialized Hospital 1 Other-no automatic monitoring equipment installed/used and connected to the Internet In accordance with the self-monitoring requirements of the "Technical Specifications for Application and Issuance of Sewage Discharge Licenses for Medical Institutions", the main sewage outlet where comprehensive medical wastewater is discharged into the urban sewage treatment plant should be equipped with flow-based online monitoring equipment and connected to the Internet. In accordance with the self-monitoring requirements of the "Technical Specifications for Application and Issuance of Sewage Discharge Licenses for Medical Institutions", the main sewage outlet where comprehensive medical wastewater is discharged into the urban sewage treatment plant should be equipped with flow-based online monitoring equipment and connected to the Internet. 2022-08-02 to 2023-08-01 According to the rectification notice, apply for funds as soon as possible, and within the rectification time limit, in accordance with the self-monitoring requirements of the "Technical Specifications for Application and Issuance of Pollutant Discharge Licenses for Medical Institutions", install flow-based online monitoring equipment at the main medical wastewater outlet and networking.
91130681MA0GA8YA6T001R North China Aluminum New Material Technology Co., Ltd. Aluminum rolling processing 1 No drainage certificate Apply for drainage certificate 2022-06-01 to 2023-05-31 The enterprise plans to conduct relevant testing, apply for a drainage certificate, and change the pollution discharge license before May 31, 2023. During the rectification period, self-monitoring will be carried out in accordance with self-monitoring requirements
91610303MA6X9WMC2P001R Shaanxi Baiyifang Construction Engineering Co., Ltd. Sewage treatment and its recycling 1 Other-no automatic monitoring equipment installed/used and connected to the Internet 1. The total wastewater discharge outlet temperature, total phosphorus, and total nitrogen (monitored on a daily basis before the technical specifications for automatic monitoring of total nitrogen are released and implemented) should be automatically monitored. 2. The inlet and outlet water online monitoring equipment must be connected to the pollution source automatic monitoring system platform of the ecological environment department. 2022-07-25 to 2023-01-24 Install automatic monitoring equipment for wastewater discharge outlet temperature, total phosphorus, and total nitrogen as required. The inlet and outlet water online monitoring facilities are connected to the pollution source automatic monitoring system platform of the ecological environment department.
9114112208097113X0001R Shanxi Qianneng Mengtian Building Materials Co., Ltd. Wooden door and window manufacturing 1 No control measures have been taken to control nitrogen oxides in boilers Boiler waste gas undergoes low-nitrogen transformation 2019-12-31 to 2020-04-30
91542200783526665T001V Shannan Regional Medical Waste Centralized Disposal Center Hazardous waste management - incineration 1 Other-no automatic monitoring equipment installed/used and connected to the Internet Connect online monitoring equipment to the Internet 2022-07-12 to 2023-07-11 Contact the network service provider as soon as possible and connect the device to the Internet
91511011206562914R001R Hongda Foundry, Dongxing District, Neijiang City Ferrous metal casting 1 Cannot meet emission standards Correct waste gas pollution control facilities as required and provide compliance monitoring data 2022-06-30 to 2023-06-29 After consulting relevant technical personnel, after installing the equipment, ask a qualified third-party monitoring company to conduct monitoring
91511011206562914R001R Hongda Foundry, Dongxing District, Neijiang City Ferrous metal casting 2 Other-no automatic monitoring equipment installed/used and connected to the Internet In accordance with the requirements of technical specifications, install automatic monitoring equipment and network with the ecological environment department 2022-06-30 to 2023-06-29 By consulting relevant technical personnel, purchase and install automatic monitoring equipment and network with the ecological environment department
91320413785566193D001R Changzhou Tanglong Electronics Co., Ltd. Special equipment manufacturing for semiconductor devices 1 The sewage pipe port is not equipped with a chemical oxygen demand ammonia nitrogen online detector Set up online detectors according to specifications 2019-12-20 to 2020-12-20
91320413785566193D001R Changzhou Tanglong Electronics Co., Ltd. Special equipment manufacturing for semiconductor devices 2 Unorganized emissions of organic waste gas Organic waste gas treatment facilities are set up in accordance with regulatory requirements and are discharged in an organized manner 2019-12-21 to 2020-12-21

Data update frequency

Annual Update