Introduction to PPP project data

  The full name of PPP in the PPP project is "Public—Private—Partnership", which refers to the cooperation between the government and private organizations to build urban infrastructure projects or to provide certain public goods. and services, based on the franchise agreement, form a partnership-type cooperative relationship with each other, and clarify the rights and obligations of both parties by signing a contract to ensure the smooth completion of the cooperation, and ultimately enable the parties to achieve greater than expected results alone actions with more favorable consequences.

 The domestic planned economic system ended in 1992, and the goal of establishing a socialist market economic system was established. The form of PPP projects can not only attract social capital, but also help form an effective competitive market, allowing experienced and capable professional institutions to undertake projects, combining the reliability of government public resources with the professionalism of social capital, Risks and benefits are shared, allowing full market competition to determine the companies that undertake facility projects. The government, as the rule maker and industry regulator, will manage the mechanism and give full play to the strengths of all parties.

  PPP project data is Government-enterprise cooperation urban infrastructure project data developed by CnOpenData. It covers the basic information of the project, preparation stage, procurement stage, and execution stage. It is available at each stage. Some tables are material file contents, with file names as the main display method.


Time interval

As of 2022.2.28


Field display

Basic information fields

Basic information table
Project rid
Project name
Project number
Region (province)
Region (city)
Region (district and county)
Industry (Level 1)
Industry (Level 2)
Total project investment
Stage
Initiation time
Project Demonstration Level/Batch
Reward mechanism
Project Leader
Contact number

Preparation Fields

Preparation stage information table Qualitative evaluation of value for money Financial affordability assessment and calculation
Project rid Project rid Project rid
Project Overview Indicator name Expenditure Year
Scope of cooperation Weight A-Amount of general public budget expenditure for this project
Cooperation period Grading criteria B-Amount of general public budget expenditures for existing management database projects at this level
How it works Rating results C-annual general public budget expenditure amount
Purchasing methods Percentage (%)
Value for money evaluation evaluation conclusion
Financial affordability argument conclusion
File table The left table has the same fields
Value for money evaluation report and the review and approval opinions of the industry authorities at the same level together with the financial department Project rid
New construction or renovation and expansion project proposals and approval documents File name
Feasibility study report or fund application report or project approval report, and documents such as the approval, approval or approval of the above reports by relevant competent authorities; asset evaluation report of existing public assets File PDF
Design documents and approval documents
Financial affordability demonstration report and review and approval opinions of the financial department at the same level
Asset evaluation reports of existing public assets or equity and various solutions that may be involved in the transfer of existing assets or equity
The approved project implementation plan and amendments
The government’s approval document for the implementation plan
Authorization document from the people's government at the same level to the implementing agency, that is, the government contracting party of the PPP project contract

Procurement stage fields

Procurement stage information table
Project rid
Review opinions of the industry authorities at the project level on the PPP contract to be signed
The review opinions of the financial department at the project level on the PPP contract to be signed
Review opinions of the legal department at the project level on the PPP contract to be signed
Whether the people's government at the project level has approved the PPP contract to be signed
Whether the project is approved by the people's government at the same level
The review opinions of the people's government at the project level on the inclusion of the government's multi-year fiscal expenditure responsibilities stipulated in the PPP project contract into the medium-term fiscal plan
The date when the people's government at the project level shall incorporate the multi-year government fiscal expenditure responsibilities stipulated in the PPP project contract into the medium-term fiscal plan
The government expenditure responsibility confirmation document or update adjustment document for this project, as well as the approval document from the People's Congress (or National People's Congress Standing Committee) at the same level to include the fiscal expenditure responsibility for this project in the multi-year budget
File table The left table has the same fields
Project pre-qualification announcement (including pre-qualification application documents) Project rid
(Preliminary) Bid Winning, Transaction Result Announcement and Bid Winning Notice File name
Government authorization documents for adjustments and updates during the project procurement phase File PDF
Project procurement documents, addendum documents and answers to clarifying questions
Concluding opinions of pre-qualification expert review and list of pre-qualification experts
Concluding comments of expert review of response documents and list of review experts
Confirm the list of members of the negotiating working group
Signed PPP project contract

Execution phase fields

Note: The table of annual operations and operational performance compliance of social capital or project companies has only one row of data

Execution phase information table Shareholder Subscription Project construction progress Project quality compliance inspection status Project cost and other compliance inspections Annual operations and operational performance standards of social capital or project companies Financing amount, main financing conditions and financing delivery status
Project rid Project rid Project rid Project rid Project rid Project rid Project rid
Project company name/social capital party name Serial number Serial number Serial number Serial number Serial number Serial number
The establishment time of the project company/the establishment time of the social capital party Name of shareholder Time Time Time Annual Name of financing institution
Registered capital of the project company/registered capital of the social capital party Government or social capital Construction progress description Project quality inspection status Project quality inspection status Annual performance evaluation completion time Financing amount
Investment amount Corresponding contract reservation terms Corresponding contract reservation terms Corresponding contract reservation terms Attachments related to annual operations and operational performance compliance First withdrawal time
Equity ratio (%) Is it consistent Is it consistent Is it consistent Main conditions
File table The left table has the same fields
The people's government at the same level authorizes the government investment representative Project rid
Relevant content of the project company’s financial report, including project charges and government subsidies received by the project File name
Project Construction License File PDF
Major disputes, litigation or arbitration involving the project or parties directly related to the project
Regulations and decisions made by the government at the same level or its functional departments that may have a significant impact on the project
Major changes or termination of the project
Major breach of contract and withdrawal of performance guarantee, etc.

Sample data

Basic information table

Project rid Project name Project number Region (province) Region (city) Region (district and county) Industry (Level 1) Industry (Level 2) Total project investment Stage Initiation time Project Demonstration Level/Batch Reward Mechanism Project Leader Contact number
6a2cf8f90fe74d48834bc448e0ffd31a 余江区教育体育基础设施建设及提升 PPP项目 360622202008110001 江西省 鹰潭市 余江县 教育 教育 66312590000 准备阶段 2020-07-01 无批次信息 可行性缺口补助 吴忠文 0701-5886596
528ff6133d314c5dbf07eb6f403d132e 河北省衡水市故城县西北新城道路建设项目 131126202006040001 河北省 衡水市 故城县 市政工程 市政道路 83740180000 准备阶段 2019-06-06 无批次信息 政府付费 雷有云 0318-5322422
dee75d760e3148b2963c84a426f9b592 东平县交通路网与景观设施提升PPP项目 370923202005280001 山东省 泰安市 东平县 交通运输 其他 1.06475E+11 采购阶段 2020-05-28 无批次信息 可行性缺口补助 乔冠军 0538-2828228
04cb08d13beb404e93b5964f1bf4a7b8 河北省承德市鹰手营子矿区保障性安居工程配套中学建设及存量青少年活动中心PPP项目 130804202008180001 河北省 承德市 鹰手营子矿区 教育 普通高中 14294340000 准备阶段 2020-05-22 无批次信息 可行性缺口补助 石永国 0314-7596106
8c1d04cb1abf40cb8461a54202021991 东莞市道滘镇东江下游片区水污染综合治理工程污水收集系统完善工程PPP项目 441925202004090001 广东省 东莞市 道滘镇 市政工程 污水处理 68218060000 准备阶段 2020-04-09 无批次信息 政府付费 丁照佳 0769-81332496
390ab6bac2cd4e3f9652d028b8200faa 大有经济开发区污水处理厂存量资产PPP项目 210781202008170001 辽宁省 锦州市 凌海市 市政工程 污水处理 12375710000 准备阶段 2020-08-10 无批次信息 可行性缺口补助 杨双实 0416-8666610
aecf7d549e364921881b834a6f4828a9 南京市栖霞区餐厨废弃物处置厂项目 320113202003060001 江苏省 南京市 栖霞区 市政工程 垃圾处理 24805000000 准备阶段 2019-09-19 无批次信息 可行性缺口补助 张永铖 025-85580430
feb0a71c5a2746fa8cf3a14614fd634e 兴仁市水务一体化建设(一期)PPP项目 522322202006210001 贵州省 黔西南布依族苗族自治州 兴仁市 市政工程 其他 1.07846E+11 准备阶段 2020-06-17 无批次信息 可行性缺口补助 叶颖 0859-6222218
7b618dde44474312be73c85631f9adae 桐梓县县城棚户区改造PPP建设项目 520322202008200001 贵州省 遵义市 桐梓县 保障性安居工程 棚户区改造 1.23949E+11 准备阶段 2020-07-31 无批次信息 可行性缺口补助 宗腾 0851-26622675
2e14e6a54871421f8624dc6e96784269 河北省廊坊市三河市燕郊海绵城市-合流制管网溢流污染控制工程PPP项目 131082202002200001 河北省 廊坊市 三河市 市政工程 排水 2.91095E+11 采购阶段 2019-08-12 无批次信息 可行性缺口补助 李本渤 0316-3312011
50915134b795492ca8bc2fd34130d519 东莞市厚街镇东江下游片区水污染综合治理工程污水收集系统完善工程PPP项目 441923202003240001 广东省 东莞市 厚街镇 市政工程 污水处理 1.086E+11 准备阶段 2020-03-24 无批次信息 政府付费 陈嘉豪 0769-85899179
603566a9170e4c23936531af1f0f7ec8 上饶高新区配套设施综合提升建设(一期)工程PPP项目 361122202008110001 江西省 上饶市 广丰县 市政工程 其他 75533870000 准备阶段 2020-08-01 无批次信息 可行性缺口补助 郑小军 0793-2620558
cbacb154f29d4a05a11c1320539c3f2a 灌南县城乡一体化污水治理PPP项目 320724202004020001 江苏省 连云港市 灌南县 市政工程 污水处理 2.92472E+11 准备阶段 2019-09-20 无批次信息 政府付费 姜朋 0518-83221184
cebe272bd2a047ecaccb84da3bcc47c2 东莞市石碣镇东江下游片区水污染综合治理工程污水收集系统完善工程PPP项目 441905202003240002 广东省 东莞市 石碣镇 市政工程 污水处理 77290670000 准备阶段 2020-03-24 无批次信息 政府付费 宣恩恩 0769-81813169
aac92182d6c34104ab5b02373dabc96b 福建省宁德市古田县文体中心图书馆、文化馆、博物馆建设PPP项目 35092200041220 福建省 宁德市 古田县 文化 文化场馆 29753490000 准备阶段 2018-10-09 无批次信息 可行性缺口补助 叶工 0593-3880560
c6a32847efbe4fa992c120f3f85e2e8b 云南省红河州金平县城乡人居环境提升PPP项目 532530202007270002 云南省 红河哈尼族彝族自治州 金平苗族瑶族傣族自治县 市政工程 其他 39241880000 准备阶段 2020-07-27 无批次信息 可行性缺口补助 贺伟平 0873-5221279
4a250116712f480b826dacaae065d312 宜昌市主城区污水厂网、生态水网共建项目 二期PPP工程 420500202006300001 湖北省 宜昌市 生态建设和环境保护 生态建设和环境保护 3.89983E+11 准备阶段 2019-11-04 无批次信息 可行性缺口补助 顾继胜 0717-6769505
f3958b486d034a5499ad4a1ceac648c2 云南省保山市施甸县城区综合停车场TOT项目 530521202008070001 云南省 保山市 施甸县 市政工程 停车场 20068000000 准备阶段 2020-03-24 无批次信息 可行性缺口补助 段黎明 0875-8121311
20c68aed187d45448c29e01e883b5890 东莞市石龙镇东江下游片区水污染综合治理工程污水收集系统完善工程PPP项目 441906202003250001 广东省 东莞市 石龙镇 市政工程 污水处理 36024590000 准备阶段 2020-03-26 无批次信息 政府付费 朱国锋 0769-86116337
cc3f6aeadd934daf88851030b353ba7f 贵港市产业园(粤桂园)给水厂和污水处理厂供排一体化PPP项目 450800202006290001 广西壮族自治区 贵港市 政府基础设施 政府基础设施 35743060000 采购阶段 2020-06-29 无批次信息 可行性缺口补助 黄启科 0775-4565215
248706cc9ea1401b9bba403023ef2d6c 沾化区教育及体育基础设施建设PPP项目 371603202008170001 山东省 滨州市 沾化区 教育 其他 50128700000 准备阶段 2020-07-28 无批次信息 可行性缺口补助 杨金专 0543-7325230
1485f82b5de044ff8c9b40402a2b115c 遵义市务川自治县2020年度城镇老旧小区改造项目 520326202007230001 贵州省 遵义市 务川仡佬族苗族自治县 保障性安居工程 其他 35000680000 准备阶段 2020-05-30 无批次信息 可行性缺口补助 杨昌松 0851-28764582
d72655b8165f4da4a08311b49093cac2 云南省保山市施甸县供水管网TOT项目(一期) 530521202008050001 云南省 保山市 施甸县 市政工程 供水 25514000000 准备阶段 2020-04-18 无批次信息 可行性缺口补助 蒋新智 0875-8121338
46e2995624cb4487b12ebd213c8fd09b 贵州省兴仁市国家储备林建设(二期)PPP项目 522322202007150001 贵州省 黔西南布依族苗族自治州 兴仁市 林业 林业 1.00322E+11 准备阶段 2019-10-24 无批次信息 可行性缺口补助 彭春兰 0859-6212050
672777d7e9994578a51e091a85831b62 上饶市信州区乡村振兴建设项目 361102202005150002 江西省 上饶市 信州区 其他 其他 52953940000 采购阶段 2020-05-05 无批次信息 政府付费 吴明豪 0793-8263162
4232063bcd9040a28f61c3a358473534 大伙房水库输水应急入连管线PPP项目 210200202007260001 辽宁省 大连市 水利建设 引水 4.07882E+11 采购阶段 2019-10-09 无批次信息 使用者付费 李华煜 0411-82712158
e0b42ed36f4b49af84fa7ea94b1ecd66 东莞市万江街道东江下游片区水污染综合治理工程污水收集系统完善工程PPP项目 441903202003240001 广东省 东莞市 万江 市政工程 污水处理 59350490000 准备阶段 2020-03-24 无批次信息 政府付费 詹泳超 0769-28630899
597d43919d274785a3f3e5c5dac7765d 朝阳市双塔医院异地新建PPP项目 211302202008240001 辽宁省 朝阳市 双塔区 医疗卫生 医院 25000000000 准备阶段 2020-07-06 无批次信息 可行性缺口补助 韩佳琦 0421-2855286
d0cdbafbaa1840b3b2233598a1a73ece 沁源县交通建设一期工程PPP项目 140431202008160001 山西省 长治市 沁源县 交通运输 其他 55410310000 采购阶段 2020-07-22 无批次信息 可行性缺口补助 冯智刚 0355-7832017
19ca65c6f07f444dad5e0b1c1fbd3233 义马市煤化工产业集聚区标准化厂房及配套工程建设PPP项目 411281202003250001 河南省 三门峡市 义马市 城镇综合开发 厂房建设 75000000000 准备阶段 2020-03-03 无批次信息 可行性缺口补助 王栋 0398-5855805
d108cd3c794543ea9e4014ca593640fc 东莞市中堂镇东江下游片区水污染综合治理工程污水收集系统完善工程PPP项目 441928202003240001 广东省 东莞市 中堂镇 市政工程 污水处理 54230340000 准备阶段 2020-03-24 无批次信息 政府付费 陈淑平 0769-88112239
3375c1247d614891ad808371c273e2d5 G234平顶山交界至方城县城段改建工程PPP项目 411322202005270001 河南省 南阳市 方城县 交通运输 一级公路 44325490000 准备阶段 2020-05-27 无批次信息 可行性缺口补助 靳云光 0377-67233380
68274acacccf4eb78b8aeeefc4316ee1 营口北海团山国家级海洋公园PPP项目 210881202005260001 辽宁省 营口市 盖州市 旅游 文化旅游 1.03782E+11 准备阶段 2020-04-02 无批次信息 可行性缺口补助 申思 0417-6578043
abb07006cec34b28a0bda0204f2ab2ba 五华县城污水处理厂三期扩建工程及配套管网工程 441424202002220001 广东省 梅州市 五华县 市政工程 污水处理 25641000000 准备阶段 2019-11-01 无批次信息 政府付费 陈洪涛 0753-4439632
2e4c2310393e41b89e146f6e56552b14 东莞市东城街道东江下游片区水污染综合治理工程污水收集系统完善工程PPP项目 441904202003240001 广东省 东莞市 东城 市政工程 污水处理 12685360000 准备阶段 2020-03-24 无批次信息 政府付费 宗杰航 0769-22481916
15a568bbab90406ab736169bdc69eb9f 邵东市城乡污水处理及配套管网工程PPP项目 430521202008130001 湖南省 邵阳市 邵东县 市政工程 污水处理 62356970000 准备阶段 2019-03-14 无批次信息 可行性缺口补助 吴泰怡 0739-2720196
698e6feb524744b29204db3d9006c338 东莞市东江下游片区水污染综合治理工程(麻涌镇污水收集系统完善工程) 441927202004090001 广东省 东莞市 麻涌镇 市政工程 污水处理 32666920000 准备阶段 2020-03-24 无批次信息 政府付费 冯子平 0769-81903032
ab7ad69cc9ce4a43a81c0e85654bc424 景德镇市老厂片区城中村棚户区改造PPP项目 360200202007310001 江西省 景德镇市 保障性安居工程 棚户区改造 1.13E+11 准备阶段 2020-06-10 无批次信息 可行性缺口补助 何雪峰 0798-8525136
a217e305d6614a9cb239a5793a47fef5 天津市于桥水库TOT项目 120000202008240001 天津市 水利建设 水库 1.25019E+12 准备阶段 2020-07-28 无批次信息 可行性缺口补助 客立业 022-23333662
02a7506719074411ad520f0a9b3678e3 岑巩县国家储备林建设项目(二期) 522626202008190001 贵州省 黔东南苗族侗族自治州 岑巩县 林业 林业 1.00681E+11 准备阶段 2020-05-15 无批次信息 可行性缺口补助 陈孝章 0855-3573623
f4c346690f224926bc6bb4bdb2b2f5ad 东莞市高埗镇东江下游片区水污染综合治理工程污水收集系统完善工程PPP项目 441929202003240001 广东省 东莞市 高埗镇 市政工程 污水处理 49752240000 准备阶段 2020-03-24 无批次信息 政府付费 林郁 0769-81136211
eaf28c58854846499116654eaa666cdb 南阳光电产业集聚区标准化厂房及配套基础设施建设PPP项目 411303202003240001 河南省 南阳市 卧龙区 城镇综合开发 厂房建设 2.16467E+11 准备阶段 2020-03-18 无批次信息 可行性缺口补助 王强 0377-63022295
3b4934215f4e4c4fbd19a011f597a26a 屏南县公共服务中心及廉政文化中心建设项目 350923202007290001 福建省 宁德市 屏南县 政府基础设施 政府基础设施 61139750000 准备阶段 2020-07-29 无批次信息 可行性缺口补助 陈迎川 0593-3322062
7e70f573ed444d2ca4c3d0fff9567e04 盘锦辽河观光带PPP项目(一期) 211102202008210002 辽宁省 盘锦市 双台子区 旅游 生态旅游 94940000000 准备阶段 2020-07-31 无批次信息 可行性缺口补助 王天成 0427-2361719
bc03f38496e44295b11798efa6806273 九龙坡区2020年城市有机更新老旧小区改造项目 500107202008270002 重庆市 市辖区 九龙坡区 市政工程 其他 37180000000 准备阶段 2020-06-05 无批次信息 可行性缺口补助 黄影 023-88217206
4f9ebf2dd8ef4ce89a26e4c6983b695f 龙口市城市智能体和大数据中心PPP项目 370681202007240001 山东省 烟台市 龙口市 科技 智慧城市 80598000000 准备阶段 2020-07-07 无批次信息 可行性缺口补助 成雨 0535-8521157
17c9632e6d504ad280be1d5304ccec57 江津区水环境综合治理工程(一期)PPP项目 500116202007130001 重庆市 市辖区 江津区 生态建设和环境保护 综合治理 3.89199E+11 准备阶段 2019-08-19 无批次信息 可行性缺口补助 王保华 023-47522387
984ce2ee660f4fac86dd555c8ec5ce50 永州南部生活垃圾焚烧发电厂项目 431124202003130001 湖南省 永州市 道县 能源 垃圾发电 39446000000 准备阶段 2019-06-03 无批次信息 可行性缺口补助 王本志 0746-5217451
4bdf885fc97f49448c48382b7bf8d589 云南省保山市隆阳区农村人居环境整治PPP建设项目 530502202007160001 云南省 保山市 隆阳区 生态建设和环境保护 综合治理 1.08427E+11 准备阶段 2020-07-07 无批次信息 可行性缺口补助 辉福军 0875-2216242
5f050a0707fc4ed2b1e138283b263fbc 进贤经开区温圳园日处理1万m³/d污水处理厂、进贤医疗器械产业园压力污水管道工程PPP项目 360124202002190001 江西省 南昌市 进贤县 市政工程 污水处理 12206000000 准备阶段 2019-08-26 无批次信息 可行性缺口补助 支小进 0791-85329179

Preparatory Phase Information Sheet

Project rid Project Overview Scope of cooperation Cooperation period How it works Purchasing methods Value for money evaluation conclusion Financial affordability argument conclusion
6a2cf8f90fe74d48834bc448e0ffd31a 一、建设内容:项目共包括14个子项目,①余江一小现有教学楼拆迁后重建;②余江六中:拟设一所40个班,学生规模为2000人的初级中学;③余江八小:拟建一所48个班,学生规模2160人的完全小学;④余江区锦江镇中心小学综合楼及校园提升改造工程;⑤余江三小:本次改扩建学校规模42个班,学生数2100人;⑥江尚学校建设项目:拟建设一所办学规模为48个班,学生规模为2280人的十二年一贯制学校;⑦拟建设洪湖中学劳动实践基地;⑧拟建设杨溪中心学校劳动实践基地;⑨拟在第四中学校园内新建1栋6F学生宿舍楼;⑩本项目拟建设办学规模48个班、学生人数2400人余江区二中高中部;⑪画桥中心小学扩建项目;⑫锦江灌田小学包括3班幼儿园和6班小学;⑬潢溪小学新增教学楼综合楼,教师周转房,运动场建设。⑭拟建余江综合体育馆。二、建设性质:新建+改扩建三、运作方式:本项目采取BOT(建设-运营-移交)的运作方式和“可行性缺口补助”的付费机制四、本项目总投资为66312.59万元。项目资金来源:争取银行贷50000万元,占总投资的75.40%;项目资本金16312.59万元,占总投资的24.60%。 1、余江一小改造工程建设地点位于余江区站前巷以东、果喜南路以西、广场路以南(余江区第一小学校园内)2、余江六中建设项目建设地点位于余江区邓埠镇西恩路以东,交通路以南3、余江八小建设项目建设地点位于城南大道气象局以西4、余江区锦江镇中心小学综合楼及校园提升改造工程建设地点位于余江区锦江镇工业园区,振兴路以北、产业三路以西、锦万路以东(余江区锦江镇中心小学现有校园内)5、余江三小改扩建项目建设地点位于余江三小内6、江尚学校建设项目建设地点位于中童江尚新区7、洪湖中学劳动实践基地建设项目建设地点位于洪湖中学内8、杨溪中心学校劳动实践基地建设项目建设地点位于杨溪中心学校内9、余江区第四中学学生宿舍楼建设项目建设地点位于余江区城东三山西路以南、迎洲路以北、安山路以东、东渠大道以西(余江区第四中学校园内)10、余江二中高中部建设项目建设地点位于余江区锦江镇11、画桥中心小学扩建项目建设地点位于余江区画桥镇画桥中心小学校园内12、锦江灌田小学建设项目建设地点位于锦江灌田村13、潢溪小学扩建项目建设地点位于潢溪小学东面14、余江综合体育馆建设项目建设地点位于余江韬奋公园以北 20 BOT 公开招标 通过 通过
528ff6133d314c5dbf07eb6f403d132e 新建湖西路、湖东路、翟杏基路、育英路、创新路、创业道、杏基道、扬帆北路、和顺路、顺平路、高中街、冀中大道、青浦街、和气路、祥和路、商务街等16条道路,道路总长度为30147米,总面积为1051575平方米。工程配套建设绿化、给水管道、雨污水管道、供热管网、供气管网、路灯、电缆、通信管网等辅助设施。 河北省衡水市故城县人民政府决定采用政府与社会资本方合作(PPP)模式实施故城县西北新城道路建设项目,并委托故城县住房和城乡建设局作为本项目的实施机构,主要负责项目的协调、监管、采购、管理等各项工作。北京中建政研信息咨询中心通过法定程序成为本项目的咨询服务机构,负责梳理PPP项目操作流程以及本项目实施方案、物有所值评价、财政承受能力论证、资格预审文件、采购文件、PPP合同等文件的编制工作。 15 BOT 公开招标 通过 通过
dee75d760e3148b2963c84a426f9b592 包括四个子项目:1)G105 京澳线东平改建项目二期无盐村至彭集段工程(含收费站),路线全长 6. 49 公里,采用一级公路技术标准,设计速度 80 公里/小时,双向四车道,路基宽度 25. 5 米;特大桥 1262 米/ 1 座;2)东平县州城街道南外环道路工程:路线全长4.279km,中桥1座;3)东平县交通路网提升改造项目南外环道路工程:东起滨河街,西至滨河街西段,本工程全长4808m,城市主干路。4)东平县环山路及景观设施提升工程:分为平顶山环山路及景观设施提升和青峰山景观设施提升。均为新建项目。建设期2年。项目采取可行性缺口补助,运营期间项目公司根据《山东省交通运输厅 山东省发展和改革委员会 山东省财政厅关于普通路桥车辆通行费有关事项的通知》中收费标准收取通行费,经政府方授权对项目充分市场化经营,包括在公园内游乐设施、广告冠名等。 本项目合作范围包括融资、建设、运营和移交。在运营期内,项目公司对建设产出范围内公路、收费站和景观设施运营维护:公路设施:根据《山东省公路桥梁养护管理工作制度》《公路养护技术规范》等标准,对路基、路面、桥梁涵洞、交通安全设施、防护、排水、交叉、绿化带等全部工程预防养护和小修修复养护。大修、中修修复养护不包含在项目公司运营范围内,届时由政府另安排。收费站:收费车道、机电工程及附属房屋养护,对过路车辆根据《山东省交通运输厅 山东省发展和改革委员会 山东省财政厅关于普通路桥车辆通行费有关事项的通知》中收费标准收取通行费。景观设施:按照现有园林绿化养护技术规范对南外环道路附属景观带、平顶山及青峰山景观工程日常养护,包括保洁、水体养护、绿化养护、园林道路及附属设施养护。在符合法律、法规情况下,经政府方允许,项目公司可深度开发平顶山和青峰山公园,如开展户外拓展基地和游乐设施等经营性项目 20 BOT 公开招标 通过 通过
04cb08d13beb404e93b5964f1bf4a7b8 本项目包含两部分,分别为保障性安居工程配套中学项目与存量青少年活动中心项目。配套中学项目位于鹰手营子镇老厂子村西,占地59435平方米,折合89.15亩,主要建设1栋教学综合楼,30个教室和各类专用教室;两栋宿舍楼;1栋食堂;一座风雨操场;其它配套设施用房以及塑胶操场、景观绿化、道路广场等。存量青少年活动中心位于区滨河路东北侧,项目占地4513.44平方米,折合6.77亩,提供全区青少年校外活动用教室16间,多功能厅1间。项目投资:总投资14294.34万元,其中建安工程费用9003.8万元,设备购置费用1900.0万元,工程建设其他费665.19万元,预备费462.76万元;青少年活动中心存量资产评估值2003万元,建设期利息227.34万元,铺底流动资金32.25万元。资金筹措:项目采用PPP模式,20%为项目资本金即2858.87万元,配套中学项目已获得中央基建投资预算专项资金3000万元;其余资金缺口8435.47万元由项目公司融资解决。项目合作期20年,建设期1年,运营期19年,项目采用BOT+TOT模式运作,项目公司负责项目投融资、建设、运营维护以及期满移交等职责。 本项目合作范围为承德市鹰手营子矿区配套中学项目的投资、融资、建设、运营、维护及合作期满移交,青少年活动中心的移交、运营及合作期满移交。 20 TOT+BOT 公开招标 通过 通过
8c1d04cb1abf40cb8461a54202021991 道滘项目规划新增截污次支管网76.84公里,雨污分流管网222公里,总投资估算65148.78万元,其中:建安工程57036.47万元,其他费用5009.98万元,预备费3102.32万元。建设资金由市镇两级财政按现有规定分担,其中市财政出资29319.80万元,镇财政出资35828.98万元。 项目投资、融资、建设和运营 25 BOT 公开招标 通过 通过
390ab6bac2cd4e3f9652d028b8200faa 凌海市人民政府以PPP模式将凌海市大有经开区污水处理厂、污水处理站及配套管网特许经营权进行转让。通过公开方式引入社会资本与“凌港实业公司”共同组建项目公司并授予其特许经营权,由项目公司统一负责项目范围内污水处理的经营,通过规模化经营方式降低成本,提高运营效率,实现做强做优做大的目标,不断提高企业的市场竞争力,提高公共服务质量,为凌海市经济社会发展和人民群众生活水平的提高提供更好的服务。在特许经营期届满后,项目公司应将本项目的所有权利和利益无偿移交给政府方或其指定机构。 凌海市人民政府以PPP模式将凌海市大有经开区污水处理厂、污水处理站及配套管网特许经营权进行转让。通过公开方式引入社会资本与“凌港实业公司”共同组建项目公司并授予其特许经营权,由项目公司统一负责项目范围内污水处理的经营,通过规模化经营方式降低成本,提高运营效率,实现做强做优做大的目标,不断提高企业的市场竞争力,提高公共服务质量,为凌海市经济社会发展和人民群众生活水平的提高提供更好的服务。在特许经营期届满后,项目公司应将本项目的所有资产完好的无偿移交给政府方或其指定机构。 20 TOT 公开招标 通过 通过
aecf7d549e364921881b834a6f4828a9 本项目位于南京市栖霞区龙潭,东至排洪水路、南至科港路、北至龙北大道、西至陈店路,规划总用地约40亩。合作内容主要包括餐厨废弃物收运、处置两部分,收运处置对象主要为栖霞区范围内居民日常生活以外的食品加工、餐饮服务、集中供餐等活动中产生的餐厨废弃物和废弃油脂等废弃物。 本项目位于南京市栖霞区龙潭,东至排洪水路、南至科港路、北至龙北大道、西至陈店路,规划总用地约40亩。合作内容主要包括餐厨废弃物收运、处置两部分,收运处置对象主要为栖霞区范围内居民日常生活以外的食品加工、餐饮服务、集中供餐等活动中产生的餐厨废弃物和废弃油脂等废弃物。 28 BOT 公开招标 通过 通过
feb0a71c5a2746fa8cf3a14614fd634e 本项目运作方式为建设-运营-移交(BOT),即实施机构将兴仁市水务一体化建设(一期)PPP项目特许经营权授予项目公司,项目公司承担该项目的建设、运营与维护,特许经营期满后项目公司将本项目资产无偿移交给政府。项目的建设内容主要包含城镇供水工程、污水处理工程。 本PPP项目的建设内容主要包含城镇供水工程、污水处理工程。总计供水规模合计为18.45万m3/d。其中人饮供水11.45万m3/d,工业供水7万m3/d。污水处理工程含一个城市污水处理工程及7个乡镇污水处理工程,合计污水处理规模13200m3/d。本项目运作方式为建设-运营-移交(BOT),即实施机构将兴仁市水务一体化建设(一期)PPP项目特许经营权授予项目公司,项目公司承担该项目的建设、运营与维护,特许经营期满后项目公司将本项目资产无偿移交给政府。 20 BOT 公开招标 通过 通过
7b618dde44474312be73c85631f9adae 该项目涉及棚户区住宅拆迁面积241036.27平方米,新建安置区娄山关街道办事处陈家湾地块、贺家湾地块,总用地面积104329.18平方米,安置区总建筑面积为36332.87平方米,住宅面积为288927.21平方米。 该项目涉及棚户区住宅拆迁面积241036.27平方米,新建安置区娄山关街道办事处陈家湾地块、贺家湾地块,总用地面积104329.18平方米,安置区总建筑面积为36332.87平方米,住宅面积为288927.21平方米。合作期限25年,其中建设期3年,运营期22年。 25 BOT 公开招标 通过 通过
2e14e6a54871421f8624dc6e96784269 本项目总投资29.1亿元,采取BOT模式实施,项目合作期20年,其中,建设期2年,运营期18年,主要实施以下内容:一是新建雨水管网系统工程。通过雨水主管道新建、雨水支管道改造、调蓄处理池、分散调蓄池以及远期实施的三级管网改造等综合措施,消除城市内涝、削减初期雨水污染,实现汛期雨水直排入河,满足环保达标要求;二是污水管网系统完善工程。通过新建、改造污水管网,对合流制管网进行系统性、专业化的清淤、检测和修复等措施,保证污水处理厂污水收集,解决旱季溢流污染、满足环保达标排放要求;再通过沿幸福渠、尹家沟建设截污管道,以保证城镇污水处理厂的污水收集,实现幸福渠、尹家沟沿河岸上截污,为幸福渠、尹家沟河道综合治理创造条件;三是基础设施配套工程。按照“厂、网、河一体,雨、污、泥同治”的原则,通过建设海绵城市示范工程、智能管控平台系统和中水主管网系统,实现全区排水系统科学管理、专业维护、智能管控、高效运行。 本项目总投资29.1亿元,采取BOT模式实施,项目合作期20年,其中,建设期2年,运营期18年,主要实施以下内容:一是新建雨水管网系统工程。通过雨水主管道新建、雨水支管道改造、调蓄处理池、分散调蓄池以及远期实施的三级管网改造等综合措施,消除城市内涝、削减初期雨水污染,实现汛期雨水直排入河,满足环保达标要求;二是污水管网系统完善工程。通过新建、改造污水管网,对合流制管网进行系统性、专业化的清淤、检测和修复等措施,保证污水处理厂污水收集,解决旱季溢流污染、满足环保达标排放要求;再通过沿幸福渠、尹家沟建设截污管道,以保证城镇污水处理厂的污水收集,实现幸福渠、尹家沟沿河岸上截污,为幸福渠、尹家沟河道综合治理创造条件;三是基础设施配套工程。按照“厂、网、河一体,雨、污、泥同治”的原则,通过建设海绵城市示范工程、智能管控平台系统和中水主管网系统,实现全区排水系统科学管理、专业维护、智能管控、高效运行。 20 BOT 公开招标 通过 通过
50915134b795492ca8bc2fd34130d519 新建截污次支管网长度是163.88公里(DN400DN500),雨污分流管网长度是85.37公里(DN200DN300)。 项目投资、融资、建设和运营 25 BOT 公开招标 通过 通过
603566a9170e4c23936531af1f0f7ec8 上饶高新区配套设施综合提升建设(一期)工程PPP项目总投资约为75533.87万元,其中项目资本金15533.87万元,融资资金60000万元。建设内容及规模:道路工程6870米;工业污水处理厂扩容与提标改造工程,日处理12000吨;供水管网工程39000米;挡土墙工程300米;人防建筑面积6740平方米,设备用房建筑面积842.39平方米;污水管网工程6700米;水泥路面修复工程100000平方米,道路拉毛及“白改黑”摊铺沥青面层工程30000米,水渠、绿化、亮化、人行道提升改造工程20000米;日处理量约 1万吨的新建污水处理厂1座;日供水量约5万吨的自来水厂1座;日供水量约6万吨的自来水厂1座。项目拟采用BOT+OM的运作模式。回报机制为可行性缺口补助。合作期为20年,其中建设期3年、运营期17年。 上饶高新区配套设施综合提升建设(一期)工程PPP项目总投资约为75533.87万元,其中项目资本金15533.87万元,融资资金60000万元。建设内容及规模:道路工程6870米;工业污水处理厂扩容与提标改造工程,日处理12000吨;供水管网工程39000米;挡土墙工程300米;人防建筑面积6740平方米,设备用房建筑面积842.39平方米;污水管网工程6700米;水泥路面修复工程100000平方米,道路拉毛及“白改黑”摊铺沥青面层工程30000米,水渠、绿化、亮化、人行道提升改造工程20000米;日处理量约 1万吨的新建污水处理厂1座;日供水量约5万吨的自来水厂1座;日供水量约6万吨的自来水厂1座。项目拟采用BOT+OM的运作模式。回报机制为可行性缺口补助。合作期为20年,其中建设期3年、运营期17年。 20 BOT 公开招标 通过 通过
cbacb154f29d4a05a11c1320539c3f2a 项目总投资292472万元,分为两个部分:①开发区1.5万吨工业污水处理厂1座、灌河半岛临港产业区1万吨工业污水处理厂1座,两个工业污水厂投资总额为24339万元,均为污水厂存量资产;②生活污水处理项目的投资总额为268133万元,包含新建项目及存量资产。1、存量项目:①灌南开发区工业污水处理厂,日处理能力1.5万吨、灌河半岛临港产业区工业污水处理厂,日处理能力1万吨;②灌南县城城东生活污水处理厂,处理生活污水,现日处理能力1.5万吨;③灌南县城西生活污水处理厂,现日处理能力2万吨;④9个乡镇生活污水处理厂,5个500T;2个1000T;2个2000T;⑤厂外提升泵站6座;⑥农村污水处理站42座及一体化污水处理设施49座;⑦存量管网:县城管网57.52km、乡镇管网95.18km。2、新建项目:①污水管网建设项目:县城及村镇污水管网改造及新建、建成小区雨污分流工程、污水管网建设区域道路工程;②县城城东、城西生活污水处理厂扩建工程及提升泵站建设;③乡镇存量生活污水处理厂提升改造工程;④新建农村生活污水处理站及配套污水管网;⑤智慧水务系统。 灌南县城乡一体化污水治理PPP项目包含新建项目和存量项目。1、新建项目①污水管网建设项目:县城及村镇污水管网改造及新建、建成小区雨污分流工程、污水管网建设区域道路工程;②县城城东、城西生活污水处理厂扩建工程及提升泵站建设;③乡镇存量生活污水处理厂提升改造工程;④新建农村生活污水处理站及配套污水管网;⑤智慧水务系统。2、存量项目①灌南开发区工业污水处理厂,日处理能力1.5万吨、灌河半岛临港产业区工业污水处理厂,日处理能力1万吨;②灌南县城城东生活污水处理厂,处理生活污水,现日处理能力1.5万吨;③灌南县城西生活污水处理厂,处理生活污水,现日处理能力2万吨;④9个乡镇生活污水处理厂,其中:北陈集、张店、百禄、新集、孟兴庄5个乡镇污水处理厂的日处理能力各为500T;堆沟、汤沟2个乡镇污水处理厂日处理能力各为1000T;田楼、三口2个乡镇污水处理厂日处理能力各为2000T;⑤厂外提升泵站6座;⑥农村污水处理站42座及一体化污水处理设施49座;⑦存量管网:县城管网57.52km、乡镇管网95.18km。 28 TOT+BOT 公开招标 通过 通过
cebe272bd2a047ecaccb84da3bcc47c2 本项目服务区域石碣镇 (全镇 ),项目建设内容为新建截污次支管网长度是89.19公里(DN300~DN800),雨污分流管网长度是110.90公里(DN300),建设资金由市镇两级财政按现有规定分担。 本项目ppp合作范围为项目投资、融资、建设和运营,需要引入社会资本金,同时也需要社会资本负责项目建设及运营管理。 25 BOT 公开招标 通过 通过
aac92182d6c34104ab5b02373dabc96b 根据批复后的《古田县文体中心图书馆、文化馆、博物馆建设项目可行性研究报告》,本项目总投资为29753.49万元,其中工程费用26962.00万元,工程建设其他费用1997.71万元,预备费用793.78万元。 在本项目全生命周期内,在既定的风险分配和管理原则基础上,项目公司承担本项目投融资、建设、运营及维护等职责,合作期期满后项目资产及相关权利等移交给政府;本项目竣工验收后,在合作期限内的运营管理由项目公司负责。运营管理内容为场馆物业及停车场等运营管理,包括房屋管理、设备设施管理、清洁及绿化日常养护服务、保安服务及停车场经营。 15 BOT 公开招标 通过 通过
c6a32847efbe4fa992c120f3f85e2e8b 本项目建设内容主要是金平县各个镇乡(含金平农场)的供水管网及水厂建设、污水管网和污水处理设施建设、垃圾处理设施建设等。项目拟通过引入合格社会资本负责项目的投融资、建设、运营维护,合作期满后移交给金平县人民政府指定机构。本项目合作期17年,其中建设期2年,运营维护期15年。 金平县城乡人居环境提升PPP项目的投融资、建设、运营维护、期满移交等。 17 BOT 公开招标 通过 通过
4a250116712f480b826dacaae065d312 宜昌市主城区污水厂网、生态水网共建项目二期PPP工程所属行业为生态建设和环境保护,涉及到市政工程和水利工程的建设。本项目提供的公共产品和服务主要包括:东山水质净化厂的建设和运营(旱季4万m3/d、雨季5万m3/d)、现状管网清淤和检测、宜昌市“一江两岸”污水厂网新建和改扩建、柏临河(主城区)水环境治理和区域生态修复综合整治、宜昌城区(点军区段)长江岸坡生态治理、智慧水务建设和运营。 新建项目在合作期内的投融资、设计、建设、运营维护和期满移交,以及花艳污水处理厂一期、二期以及猇亭污水处理厂一期在合作期内的租赁、运营和期满移交 30 其他 公开招标 通过 通过
f3958b486d034a5499ad4a1ceac648c2 根据《施甸县住房和城乡建设局城市道路占用费价值资产评估报告》(保万承评报字【2020】第G02号),本项目存量资产主要包括施甸县国有资产经营集团有限责任公司名下位于施甸县县城区域城市道路2710个停车泊位。拟采用TOT模式实施,保留项目资产的所有权,而仅转让项目经营权。 本项目为存量项目,项目存量资产主要包括施甸县国有资产经营集团有限责任公司名下位于施甸县县城区域城市道路2710个停车泊位。具体包括城区道路停车位、青牛白马广场停车位、原安监局停车场停车位、保障房停车位、靖花园停车位、丽景百盛停车位(兰溪公园)、县人民医院停车位、县中医院停车位、县妇幼保健院停车位。本项目采用建设-运营-移交(TOT)的运作模式,中标社会资本与政府出资方代表签订《股东协议》,共同出资成立项目公司。项目公司负责完成以上合作内容,政府方根据《PPP项目合同》的约定在一定服务期限内向项目公司支付可用性服务费和运营维护服务费;服务期期满,项目公司以约定条件将项目设施按移交方案完好移交给项目实施机构或政府指定机构。根据《PPP项目合同》,项目公司按照施甸县物价管理部门确定的停车场收费单价向使用者收取停车费,负责维护本项目的项目设备设施,保证合作期内本项目设备设施的完好可用,同时按合同约定及绩效考核结果获得政府补贴;项目合作期结束后,项目公司根据《PPP项目合同》,将项目资产、相关设施及相关资料等无偿、完好、无债务地移交给项目实施机构或施甸县政府指定机构。 20 TOT 公开招标 通过 通过
20c68aed187d45448c29e01e883b5890 新建截污次支管网长度是35.98公里(DN300DN1200),雨污分流管网长度是35.40公里(DN200DN400),一体化地埋式污水提升泵站2座。 项目投资、融资、建设和运营 25 BOT 公开招标 通过 通过
cc3f6aeadd934daf88851030b353ba7f (1)给水厂1座,近期(2025年)供水规模5.35万m3/d,其中工业供水5万m3/d,配套建设工业取水泵站1座、取水管4.77km;生活供水0.35万m3/d,配套建设生活转输泵站1座,取水管10.34km。给水厂占地40.7亩(近期),远期用地为规划预留。大圩镇转输泵站占地0.18亩,工业取水泵站占地2.22亩。(2)建设污水处理厂1座,近期(2025年)处理规模2万m3/d,配套建设尾水输送管0.25km。污水处理厂占地47.5亩(近期),远期用地规划预留。 20年(其中建设期1年,运营期19年) 20 BOT 公开招标 通过 通过
248706cc9ea1401b9bba403023ef2d6c 本项目建设内容包括沾化区城区基础教育设施建设项目、沾化中小学体育场地标准化提升工程、沾化区中小学学生公寓和教师周转房及餐厅建设和沾化区智慧健身工程建设项目,总投资51928.7万元,其中土地征拆费用1800万元由沾化区财政局统筹安排,不纳入PPP项目实施范围,据此调整后PPP项目总投资为50128.70万元。项目建设期1年,运营期9年,项目公司负责融资、设计、建设、运营,运营期间学校核心教育业务由原校方负责,项目公司负责对建设产出范围内设施运营维护,具体包括5所学校教学楼附属设维修、保洁和后勤管理,24所学校体育场地设施运营、4所中小学学生公寓和周转房管理及智慧健身项目管理。 本项目合作范围包括融资、设计、建设和运营。在运营期内,学校教育核心业务由原校方负责,项目公司对建设产出范围内设施运营维护。具体包括5所学校设施维修、保洁及后勤管理等,24所学校体育场地设施运营、4所中小学学生公寓、教师周转房、餐厅及智慧健身项目运营管理 10 BOT 公开招标 通过 通过
1485f82b5de044ff8c9b40402a2b115c 项目实施地点:务川自治县老一中家属院小区、汞矿小区、西环小区、环城小区、务星小区、惠民小区、老公安局(现交警队)片区、务川县都濡镇原职中校园场地。项目建设规模及内容:本项目涉及7个小区和一个幼儿园,3150户居民,涉及住宅面积约为283500.00平方米。分别为小区为老一中家属院小区、汞矿小区、西环小区、环城小区、务星小区、惠民小区、老公安局(现交警队)片区(拆除危房,建设智能停车场,指标纳入惠民小区),老旧改造内容为给水管网改造、供配电改造、燃气管道改造、雨污管道改造、庭院路灯改造、管线设施改造、更新改造环卫设施、小区外立面改造、小区绿化改善、小区安防监控系统改造、停车场建设、电梯加装、道路加固工程、健身运动设施、服务用房建设。建设务川自治县城关幼儿园,共18个教学班,35人/班,容纳630名幼儿新生,项目占地8.68亩,建设教学及辅助用房6070.18平方米,其中综合楼5788.41㎡,值班室20㎡,配电室及消防水池261.77㎡,容积率1.05,建筑密度33.86%,绿化率20.7%。停车位8个,同时完善相关附属及设备设施购置, 建设内容:本项目实施内容包含7个小区和一个幼儿园,分别为小区为老一中家属院小区、汞矿小区、西环小区、环城小区、务星小区、惠民小区、老公安局(现交警队)片区(拆除危房,建设智能停车场,指标纳入惠民小区),老旧改造内容为给水管网改造、供配电改造、燃气管道改造、雨污管道改造、庭院路灯改造、管线设施改造、更新改造环卫设施、小区外立面改造、小区绿化改善、小区安防监控系统改造、停车场建设、电梯加装、道路加固工程、健身运动设施、服务用房建设;建设务川自治县城关幼儿园及其相关附属及设备设施购置。运营内容:本项目运营内容包括所有建设内容的维护管理,取得使用者付费,并到期移交项目资产和特许经营权。本项目使用者付费主要来源于物业费、车位租金、服务用房租金和广告费等。 20 ROT 公开招标 通过 通过
d72655b8165f4da4a08311b49093cac2 根据《施甸县水务局供水管网水费收入资产评估报告》(保万承评报字【2020】第G01号),本项目存量资产涉及保山市水长水业有限公司、施甸县自来水公司、施甸县乾元水利投资有限责任公司姚关经营部、施甸县天源供水公司由旺经营部管理范围内的水厂及管网,具体包括姚关片区、施甸县城片区(含仁和片区)、由旺片区、华兴工业园区、水长片区内10个自来水厂及相关管网。项目拟采用TOT模式运作,保留项目资产的所有权,而仅转让项目经营权。 本项目为存量项目,项目存量资产涉及保山市水长水业有限公司、施甸县自来水公司、施甸县乾元水利投资有限责任公司姚关经营部、施甸县天源供水公司由旺经营部管理范围内的水厂及管网,具体包括姚关片区、施甸县城片区(含仁和片区)、由旺片区、华兴工业园区、水长片区内10个自来水厂及相关管网。本项目采用建设-运营-移交(TOT)的运作模式,中标社会资本与政府出资方代表签订《股东协议》,共同出资成立项目公司。根据《PPP项目合同》,项目公司按照施甸县物价管理部门确定的水价向用户收取水费,负责维护本项目的项目设备设施,保证合作期内本项目设备设施的完好可用,同时按合同约定及绩效考核结果获得政府补贴;项目合作期结束后,项目公司根据《PPP项目合同》,将项目资产、相关设施及相关资料等无偿、完好、无债务地移交给项目实施机构或施甸县政府指定机构。 20 TOT 公开招标 通过 通过
46e2995624cb4487b12ebd213c8fd09b 贵州省兴仁市国家储备林建设(二期)PPP项目属于林业领域新建项目,项目可研估算总投资100,322.2万元,兴仁市国家储备林建设项目(二期)建设规模为92000.0亩,包括营造林工程、配套基础设施、支撑体系建设等。由兴仁市人民政府授权兴仁市林业局作为本项目的实施机构,负责前期准备和采购工作,拟由林业局作为采购人,采用公开招标的方式选择投融资能力、运营管理能力较强的社会资本参与本项目,与政府方出资代表共同成立项目公司,由项目公司负责建设、运营、移交。 贵州省兴仁市国家储备林建设(二期)PPP项目属于林业领域新建项目,项目可研估算总投资100,322.2万元,兴仁市国家储备林建设项目(二期)建设规模为92000.0亩,包括营造林工程、配套基础设施、支撑体系建设等。由兴仁市人民政府授权兴仁市林业局作为本项目的实施机构,负责前期准备和采购工作,拟由林业局作为采购人,采用公开招标的方式选择投融资能力、运营管理能力较强的社会资本参与本项目,与政府方出资代表共同成立项目公司,由项目公司负责建设、运营、移交。 30 BOT 公开招标 通过 通过
672777d7e9994578a51e091a85831b62 项目建设投资 52953.94 万元,其中建筑安装工程费 40833.34 万元,工程建设其他费用4886.06万元,基本预备费3657.55万元,建设期贷款利息 3577.00 万元。 本次上饶市信州区乡村振兴建设项目建设内容主要包括以下几方面: (1)道路硬化工程(户户通道路为主); (2)排水沟、雨污水管道工程,包括:污水管道、化粪池、污水处理池、排水沟、水渠、雨水管道;(3)垃圾收集及处理,包括:垃圾桶(箱)、垃圾车、垃圾转运站,保洁工具;(4)水环境治理,包括:水沟(渠)改造、水塘整治、河道整治、水塘清淤泥、河堤建设、河流治理; (5)公厕及畜禽栏棚改造,包括:标准厕所、旅游厕所、畜禽栏棚改造; (6)农村危旧住房改造,包括:危房改建、旧房改造; (7)文化广场基础设施建设,包括:村文化站建设、硬化广场地面、广播。 "本次上饶市信州区乡村振兴建设项目建设及运营内容主要包括以下几方面:(1)道路硬化工程(户户通道路为主);(2)排水沟、雨污水管道工程,包括:污水管道、化粪池、污水处理池、排水沟、水渠、雨水管道;(3)垃圾收集及处理,包括:垃圾桶(箱)、垃圾车站,保洁工具;(4)水环境治理,包括:水沟(渠)改造、水塘整治、河道整治、水塘清淤泥、河堤建设、河流治理;(5) 公厕改造,包括:旅游厕所;(6)古建筑保护维修改造,包括:古建筑加固及修复、古建筑景观行性改造及古建筑配套绿化景观提升。(7)文化广场基础设施建设,包括:村文化站建设、硬化广场地面、广播。" 17 BOT 公开招标 通过 通过
4232063bcd9040a28f61c3a358473534 项目起点位于鞍山加压泵站,位于鞍山市达道湾镇大镇台村,终点到达碧流河水库,全长165.07公里。主要内容包括:输水管线150.96公里。其中,PCCP输水管线138.72公里,管线直径2.8米,设计流速为1.69米/秒;钢管输水管线12.24公里,直径分别为输水隧洞以前2.8米,输水隧洞以后2.4米。输水隧洞14.11公里隧洞净宽为3.2米、净高为3.48米,底坡为0.34%;加压泵站2座,分别为鞍山泵站〈一级加压泵站)、盖州泵站(二级加压泵站)。其中,鞍山加压泵站设计扬程90.52米,设6台水泵,4用2备,泵站占地面积为48.21亩,泵房建筑面积为3339㎡:盖州加压泵站设计扬程98.34米,设6台水泵,4用2备,泵站占地面积为48.84亩,泵房建筑面积为3200㎡。排气阀井355座、泄水阀井24座、检修阀井29座。本项目为存量项目,目前项目产权持有单位为大连市水务集团水资源有限公司,特许经营权评估价值为407881.74万元. 项目合作范围为大伙房水库输水应急入连管线项目北段工程,位于辽阳、鞍山、营口、大连市境内,项目起点位于鞍山加压泵站,位于鞍山市达道湾镇大镇台村,终点到达碧流河水库,全长165.07公里。主要内容包括:输水管线150.96公里,输水隧洞14.11公里,加压泵站2座,泵站占地面积为48.84亩,泵房建筑面积为3200㎡。排气阀井355座、泄水阀井24座、检修阀井29座。 20 TOT 竞争性磋商 通过 通过
e0b42ed36f4b49af84fa7ea94b1ecd66 按照“管网全覆盖、污水全收集、管道全输送、末端全处理”的污水设计理念,将现状管网梳理改造完善形成清晰、完整的雨污水两套干管管网系统,消除干管系统上的总口截流和截流井,消除入河排污口,全面提升污水处理厂的进水浓度。项目建设内容为新建截污次支管网长度70.50公里(DN300DN900),雨污分流管网长度24.19公里(DN200DN300)。 新建次支管网合计长度70.50km,新建预制钢砼检查井共1874座:预制钢砼检查井共136座;钢砼井共113座:顶管工作井共4座;顶管接收井共4座。新建雨污分流配套管网长度24.19km。新建塑料检查井共652座:塑料检查井共526座 25 BOT 公开招标 通过 通过
597d43919d274785a3f3e5c5dac7765d 本工程占地面积14757.12m2,约合22.36亩。总建筑面积34340m2,设置床位200张。主要建筑包括门诊、发热门诊及结核病防治楼、附属用房、氧仓、住院部及附属工程。本工程总建筑面积34340m2,主要建筑包括门诊、发热门诊及结核病防治楼、附属用房、氧仓、住院部及附属工程。门诊病房综合楼总建筑面积33977m2,其中地上建筑面积23724 m2,地下建筑面积10253m2。高压氧仓363m2。本项目由朝阳市双塔区人民政府授权双塔区卫生健康局为实施机构,由区卫生局在授权范围内负责项目准备、采购、监管和移交等工作及区政府授权负责的相关工作。 朝阳市双塔医院异地新建项目的投融资、设计、建设、非核心医疗运营、移交等工作,合作期限30年(含2年建设期)。 30 BOT 公开招标 通过 通过

Qualitative evaluation of value for money

Project rid Indicator name Weight Grading criteria Rating results
6a2cf8f90fe74d48834bc448e0ffd31a 全生命周期整合程度 15 81—100=项目资料表明,投资、融资、建造和全部运营、维护将整合到一个合同中;对于存量项目采用PPP模式,至少有融资和全部运营、维护整合到一个合同中。 80.4
6a2cf8f90fe74d48834bc448e0ffd31a 风险识别与分配 15 81—100=项目资料表明,已进行较为深入的风险识别工作,预计其中的绝大部分风险或全部主要风险将在政府与社会资本合作方之间明确和合理分配。 78.8
6a2cf8f90fe74d48834bc448e0ffd31a 绩效导向与鼓励创新 15 81—100=绝大部分绩效指标符合项目具体情况,全面合理,清晰明确;项目产出说明提出了较为全面、清晰和可测量的产出规格要求,没有对如何交付提出要求。 77.2
6a2cf8f90fe74d48834bc448e0ffd31a 潜在竞争程度 15 81—100=项目将引起社会资本之间竞争的潜力大且已存在明显的证据或迹象,例如参与项目推介会的行业领先的国内外企业数量较多。 78.2
6a2cf8f90fe74d48834bc448e0ffd31a 行业示范性 5 81—100=项目相关信息表明,项目行业示范性很好。 78.2
528ff6133d314c5dbf07eb6f403d132e 生命周期整合程度 10 81-100:项目所有环节都能整合(存量项目:至少有融资和全部运营、维护整合到同一合同中);61-80:项目所有环节基本完整,绝大部分工作得到整合;41-60:项目所有环节中不能将设计、运营等某一环节整合;21-40:项目所有环节中不能将其中的若干环节整合;0-20:项目所有环节中的各项工作均为独立、分散,无法整合。 87.67
528ff6133d314c5dbf07eb6f403d132e 风险识别与分配 15 81-100:已进行深入的风险识别,各类风险识别全面,预计各类风险都能制定有效的风险应对措施,参与主体具有很好的风险控制和管理能力;61-80:已进行较为深入的风险识别,各类风险识别较为全面,预计绝大部分风险都将制定有效的风险应对措施,参与主体具有较好的风险控制和管理能力;41-60:已进行初步的风险识别,各类风险识别尚不够全面,预计一般风险都能制定有效的风险应对措施,参与主体具备基本的风险控制和管理能力;21-40:已开展了风险识别工作,但未能清晰识别项目中的各类风险,预计少部分风险能制定有效的风险应对措施,参与主体具备较弱的风险控制和管理能力;0-20:尚未开展风险识别,预计各类风险均无法制定有效的风险应对措施,参与主体具备较差的风险控制和管理能力。 83.67
528ff6133d314c5dbf07eb6f403d132e 绩效导向与鼓励创新 15 81-100:围绕公共服务供给数量、质量和效率建立绩效指标,且监测管理机制和激励导向价格设定具有合理性;项目在方案设计、服务提供、组织管理等众多方面几乎无限制,可完全进行独立自主创新,创新能力强;61-80:围绕公共服务供给数量、质量和效率建立绩效指标,监测管理机制和激励导向价格设定合理性在可接受范围内;项目在方案设计、服务提供、组织管理等众多方面限制较少,可较好进行独立自主创新,创新能力较强;41-60:部分指标围绕公共服务供给数量、质量和效率建立,监测管理机制和激励导向价格设定合理性在可接受范围内;项目在方案设计、服务提供、组织管理等众多方面有一定限制,可进行一定范围的独立自主创新,创新能力一般;21-40:绩效指标设定较为随意,缺乏相关参考依据,监测管理机制和激励导向价格设定不太具有合理性;项目在方案设计、服务提供、组织管理等众多方面限制较多,较难进行独立自主创新,创新能力较弱;0-20:绩效指标设定无市场逻辑,缺乏相关参考依据,监测管理机制和激励导向价格设定超出市场可接受范围;项目在方案设计、服务提供、组织管理等众多方面限制非常多,无法进行独立自主创新,缺乏创新能力。 80.67
528ff6133d314c5dbf07eb6f403d132e 潜在竞争程度 10 81-100:项目具有很大市场吸引力,存在较多可参与竞争的市场主体,已有多家市场主体有意向参与,竞争程度激烈;61-80:项目具有较大市场吸引力,存在较多可参与竞争的市场主体,预计将有多家市场主体参与,竞争程度较高;41-60:项目市场吸引力一般,存在可参与竞争的市场主体,预计将有一定数量的市场主体参与,竞争程度一般;21-40:项目缺乏市场吸引力,存在少量可参与竞争的市场主体,预计将有少量市场主体参与,市场竞争不足;0-20:项目严重缺乏市场吸引力,预计难以找到可参与竞争的市场主体,市场竞争严重缺乏。 82.33
528ff6133d314c5dbf07eb6f403d132e 政府机构能力 15 81-100:政府具备很强的履约能力,不能履约可能性很小,相关政府部门能很好行使监督权;61-80:政府具备较强的履约能力,不能履约可能性较小,相关政府部门能较好行使监督权;41-60:政府具备较强的履约能力,但预计不能履约可能性较大,相关政府部门能基本行使监督权;21-40:政府履约能力不强,但预计未来将得到改善,相关政府部门行使监督权存在一定困难;0-20:政府履约能力不强,且预计未来无法改善,不能履约可能性很大,相关政府部门无法充分行使监督权。 89.33
528ff6133d314c5dbf07eb6f403d132e 可融资性 15 81-100:项目对金融机构吸引力很大,普遍容易获得融资,已有多家金融机构表达意向;61-80:项目对金融机构吸引力较大,且市场主体融资能力强,较容易获得融资;41-60:项目对金融机构吸引力一般,且市场主体融资能力不强,可取得更多支持条件获得融资;21-40:项目对金融机构吸引力较差,且市场主体融资能力不强,不易取得更多支持条件获得融资;0-20:项目对金融机构吸引力差,且市场主体融资能力不强,融资非常困难。 84.33
528ff6133d314c5dbf07eb6f403d132e 项目规模大小 5 本指标主要通过查看 PPP 项目的投资额来评分。只有 PPP 项目规模足够大。才能使 PPP 项目的前期费用占项目全生命周期成本的比例处于合理和较低水平。一般情况下,项目规模越大。越能够采用PPP模式吸引社会资本参与。81-100:新建项目的投资额在5亿元人民币以上;61-80:新建项目的投资额在 1~5 亿元人民币之间;41-60:新建项目的投资额在0.8~1 亿元人民币之间;21-40:新建项目的投资额在0.5~0.8 亿元人民币之间;0-20:新建项目的投资额在 5000万元人民币以下。 86.33
528ff6133d314c5dbf07eb6f403d132e 主要固定资产种类 10 项目的固定资产种类越多,由社会资本方实施,将实现更高的效率。81-100 :项目的资产种类在三个以上。61-80:项目是两类较复杂或技术要求较高资产的组合。41-60:项目是两类中等复杂程度资产的组合,或者是若干同类资产打包项目。21-40:项目是两类复杂程度较低资产的组合,或者项目是一个较为复杂的资产。0-20:项目只包括一个较为简单的资产。 82
528ff6133d314c5dbf07eb6f403d132e 行业示范性 5 项目实施对行业的示范效应越强,行业示范性得分越高。81-100 =项目的行业示范性非常好。61-80=项目是行业示范性较好。41-60=项目是行业示范性一般。21-40=项目是行业示范性较差。0-20=项目行业示范性非常差。 81.33
dee75d760e3148b2963c84a426f9b592 全生命周期整合程度 15 100—81:项目资料表明,设计、融资、建造和全部运营、维护等将整合到一个合同中;对于存量项目采用PPP模式,至少有融资和全部运营、维护将整合到一个合同中;80—61:项目资料表明,设计、融资、建造以及核心服务或大部分非核心服务的运营、维护将整合到一个合同中;对于存量项目采用PPP模式,至少有融资和核心服务或大部分非核心服务运营、维护将整合到一个合同中;60—41:项目资料表明,设计、融资、建造和维护等将整合到一个合同中,但不包括运营;或融资、建造、运营和维护等将整合到一个合同中,但不包括设计;对于存量项目采用PPP模式,仅运营和维护将整合到一个合同中;40—21:项目资料表明,融资、建造和维护等将整合到一个合同中,但不包括设计和运营;20—0:项目资料表明,设计、融资、建造等三个或其中更少的环节将整合到一个合同中 13.05
dee75d760e3148b2963c84a426f9b592 风险识别与分配 15 100—81:项目资料表明,已进行较为深入的风险识别工作,预计其中的绝大部分风险或全部主要风险将在政府与社会资本合作方之间明确和合理分配;80—61:项目资料表明,已进行较为深入的风险识别工作,预计其中的大部分风险主要风险可以在政府与社会资本合作方之间明确和合理分配;60—41:项目资料表明,已进行初步的风险识别工作,预计这些风险可以在政府与社会资本合作方之间明确和合理分配;40—21:项目资料表明,已进行初步的风险识别工作,预计这些风险难以在政府与社会资本合作方之间明确和合理分配;20—0:项目资料表明,尚未开展风险识别工作,或没有清晰识别风险 12.9
dee75d760e3148b2963c84a426f9b592 绩效导向与鼓励创新 15 100—81:绝大部分绩效指标符合项目具体情况,全面合理,清晰明确。项目产出说明提出了较为全面、清晰和可测量的产出规格要求,没有对如何交付提出要求;80—61:大部分绩效指标符合项目具体情况,全面合理,清晰明确。项目的产出规格要求较为全面、清晰和可测量,并对如何交付提出了少量要求;60—41:绩效指标较符合项目具体情况,但不够全面和清晰明确,缺乏部分关键绩效指标。项目的产出规格要求不够全面、清晰和可测量,并对如何交付提出了少量要求;40—21:已设置的绩效指标比较符合项目具体情况和明确,但主要关键绩效指标未设置。项目的产出规格要求不够全面、清晰和可测量,并对如何交付提出了较多要求;20—0:未设置的绩效指标或绩效考核指标不符合项目具体情况,不合理、不明确。项目的产出说明基本上没有明确产出规格要求,或主要对如何交付进行了要求 13.35
dee75d760e3148b2963c84a426f9b592 潜在竞争程度 15 100—81:项目将引起社会资本(或联合体)之间竞争的潜力大且已存在明显的证据或迹象,例如参与项目推介会的行业领先的国内外企业数量较多;80—61:项目将引起社会资本(或联合体)之间竞争的潜力较大,预期后续通过采取措施可进一步提高竞争程度;60—41:项目将引起社会资本(或联合体)之间竞争的潜力一般,预期后续通过采取措施可提高竞争程度;40—21:项目将引起社会资本(或联合体)之间竞争的潜力较小,预期后续通过采取措施有可能提高竞争程度;20—0:项目将引起社会资本(或联合体)之间竞争的潜力小,预期后续不大可能提高竞争程度 12.45
dee75d760e3148b2963c84a426f9b592 政府机构能力 10 100—81:政府具备较为全面、清晰的PPP理念,且本项目相关政府部门及机构具有较强的PPP能力;80—61:政府的PPP理念一般,且本项目相关政府部门及机构具有较强的PPP能力;60—41:政府的PPP理念一般,且本项目相关政府部门及机构的PPP能力一般;40—21:政府的PPP理念较欠缺,且本项目相关政府部门及机构的PPP能力较欠缺且不易较快获得;20—0:政府的PPP理念欠缺,且本项目相关政府部门及机构的PPP能力欠缺且难以获得 8.6
dee75d760e3148b2963c84a426f9b592 融资可行性 10 100—81:预计项目对金融机构的吸引力很高,或已有具备强进实力的金融机构明确表达了对项目的兴趣;80—61:预计项目对金融机构的吸引力较高;60—41:预计项目对金融机构的吸引力一般,通过后续进一步准备,可提高吸引力;40—21:预计项目对金融机构的吸引力较差,通过后续进一步准备,可提高吸引力;20—0:预计项目对金融机构的吸引力很差 8.3
dee75d760e3148b2963c84a426f9b592 项目规模 5 “100—81”=新建项目的投资或存量项目的资产公允价值在10亿元以上;“80—61”=新建项目的投资或存量项目的资产公允价值在2—10亿元之间;“60—41”=新建项目的投资或存量项目的资产公允价值在1—2亿元之间;“40—-21”=新建项目的投资或存量项目的资产公允价值在5000万元到1亿元之间;“20—0”=新建项目的投资或存量项目的资产公允价值在5000万元以下 4.5
dee75d760e3148b2963c84a426f9b592 全生命周期成本估计准确性 10 “100—81”=项目相关信息表明,项目的全生命周期成本已被很好的理解和认识,并且被准确预估的概率为基本确定;“80-61”=项目相关信息表明,项目的全生命周期成本已被很好的理解和认识,并且被准确预估的概率为很可能;“60-41”=项目相关信息表明,项目的全生命周期成本已被较好的理解和认识,并且被准确预估的概率为可能;“40-21”=项目相关信息表明,项目的全生命周期成本已被较好的理解和认识,但尚无法确定能否被准确预估;“20-0”=项目相关信息表明,项目的全生命周期成本基本上没有得到理解和认识 8.3
dee75d760e3148b2963c84a426f9b592 项目资产寿命 5 “100—81”=资产的预期使用寿命大于40年;“80—61”=资产的预期使用寿命为31—40年;“60—41”=资产的预期使用寿命为21—30年;“40—-21”=资产的预期使用寿命为11—20年;“20—0”=资产的预期使用寿命小于10年 4.1
04cb08d13beb404e93b5964f1bf4a7b8 全生命周期整合程度 10 100-81=有利=项目资料表明,设计、投融资、建造和全部运营、维护到将整合到一个合同中。80-61=较有利=项目资料表明,设计、投融资和建造以及核心服务或大部分非核心服务的运营、维护将整合到一个合同中。60-41=一般=项目资料表明,设计、投融资、建造和维护等将整合到一个合同中,但不包括运营;或融资、建造、运营和维护等将整合到一个合同中,但不包括设计。40-21=较不利=项目资料表明,投融资、建造和维护等将整合到一个合同中,但不包括设计和运营。20-0=不利=项目资料表明,设计、投融资、建造等三个或其中更少的环节将整合到一个合同中。 79
04cb08d13beb404e93b5964f1bf4a7b8 风险识别与分配 15 100-81=有利=项目资料表明,已进行较为深入的风险识别工作,预计其中的绝大部分风险或全部主要风险将在政府与社会资本合作方之间明确和合理分配。80-61=较有利=项目资料表明,已进行较为深入的风险识别工作,预计其中的大部分主要风险可以在政府与社会资本合作方之间明确和合理分配。60-41=一般=项目资料表明,已进行初步的风险识别工作,预计这些风险可以在政府与社会资本合作方之间明确和合理分配。40-21=较不利=项目资料表明,已进行初步的风险识别工作,预计这些风险难以在政府与社会资本合作方之间明确和合理分配。20-0=不利=项目资料表明,尚未开展风险识别工作,或没有清晰识别风险。 81.71
04cb08d13beb404e93b5964f1bf4a7b8 绩效导向与鼓励创新 15 100-81=有利=绝大部分绩效标准和监管机制符合项目具体情况,全面合理,清晰明确;项目产出说明提出了较为全面、清晰和可测量的产出规格要求。80-61=较有利=大部分绩效标准和监管机制符合项目具体情况,全面合理,清晰明确;项目的产出规格要求较为全面、清晰和可测量。60-41=一般=绩效标准和监管机制比较符合项目具体情况,但不够全面和清晰明确,缺乏部分关键绩效指标;项目的产出规格要求不够全面、清晰和可测量。40-21=较不利=已设置的绩效标准和监管机制比较符合项目具体情况和明确,但主要关键绩效指标未设置;项目的产出规格要求不够全面、清晰和可测量。20-0=不利=未设置绩效标准和监管机制或不符合项目具体情况,不合理、不明确;项目的产出说明基本上没有明确产出规格要求。 79.43
8c1d04cb1abf40cb8461a54202021991 预期使用寿命 10 100-81有利、80-61较有利、60-41一般、40-21较不利、20-0不利 96.14
aecf7d549e364921881b834a6f4828a9 政府机构能力 10 ●81—100=政府具备较为全面、清晰的PPP理念,且本项目相关政府部门及机构具有较强的PPP能力。 ●61—80=政府的PPP理念一般,但本项目相关政府部门及机构具有较强的PPP能力。 ●41—60=政府的PPP理念一般,且本项目相关政府部门及机构的PPP能力一般。 ●21—40=政府的PPP理念较欠缺,且本项目相关政府部门及机构的PPP能力较欠缺且不易较快获得。 ●0—20=政府的PPP理念欠缺,且本项目相关政府部门及机构的PPP能力欠缺且难以获得。 90
feb0a71c5a2746fa8cf3a14614fd634e 法律政策和环境 5 81~100:符合现行法律法规规章和政策等要求,且属于国家支持鼓励范围; 61~80:符合现行法律法规规章和政策等要求; 41~60:受到现行法律法规规章和政策等的个别限制,但较容易得到解决; 21~40:受到现行法律法规规章和政策等的个别限制,可以解决但比较困难; 4.73
feb0a71c5a2746fa8cf3a14614fd634e 行业示范性 10 81~100:项目成功实施后有非常好的示范性,可切实解决政府当前难题; 61~80:项目成功实施后有较好的示范性,可很大程度解决政府难题; 41~60:项目成功实施后有一定的示范性,可部分解决政府难题; 21~40:项目成功实施后不具备示范性,不能解决政府难题; 0~20:项目成功实施后不具备示范性,会带来负面的示范性。 9.14
7b618dde44474312be73c85631f9adae ①全生命周期整合程度 15 "81-100:项目所有环节都能整合(存量项目:至少融资和全部运营、维护环节整合到同 一合同中); 61-80:项目所有环节基本完整,绝大部分工作得到整合; 41-60:项目所有环节中不能将设计、运营等某一环节整合; 21-40:项目所有环节不能将其中的若干环节整合; 0-20:项目所有环节中的各项工作均为独立、分散、无法整合。" 13.56
7b618dde44474312be73c85631f9adae ②风险识别与分配 15 "81-100:已进行深入的风险识别,各类风险识别全面,预计各类风险都能制定有效的风险应对措施,参与主体具有很好的风险控制和管理能力; 61-80:已进行较为深入的风险识别,各类风险识别较为全面,预计绝大部分风险都将制定有效的风险应对措施,参与主体具有较好的风险控制和管理能力; 41-60:已进行初步的风险识别,各类风险识别尚不够全面,预计一般风险都能制定有效的风险应对措施,参与主体具备基本的风险控制和管理能力; 21-40:已开展了风险识别工作,但未能清晰识别项目中的各类风险,预计少部分风险能制定有效的风险应对措施,参与主体具备较弱的风险控制和管理能力; 0-20:尚未开展风险识别,预计各类风险均无法制定有效的风险应对措施,参与主体具备较差的风险控制和管理能力。" 11.04
7b618dde44474312be73c85631f9adae ③绩效导向与鼓励创新 15 "81-100:围绕公共服务供给数量、质量和效率建立绩效指标,充分落实节能环保、支持本国产业等政府采购政策,项目在方案设计、服务提供、组织管理等众多方面几乎无限制,可完全进行独立自主创新,创新能力强; 61-80:围绕公共服务供给数量、质量和效率建立绩效指标,落实节能环保、支持本国产业等政府采购政策,项目在方案设计、服务提供、组织管理等众多方面限制较少,可较好进行独立创新,创新能力较强; 41-60:部分指标围绕公共服务供给数量、质量和效率建立,重点部分能够落实节能环保、支持本国产业等政府采购政策,项目市场吸引力一般,存在可参与竞争的市场主体,预计将有一定数量的市场主体参与,竞争程度一般; 21-40:绩效指标设定较为随意,缺乏相关参考依据,节能环保、支持本国产业等政府采购政策落实不力,项目缺乏市场吸引力,存在少量可参与竞争的市场主体,预计将有少量市场主体参与,市场竞争不足; 0-20:绩效指标设定无市场逻辑,缺乏相关参考依据,几乎无落实节能环保、支持本国产业等政府采购政策,项目严重缺乏市场吸引力,预计难以找到可参与竞争的市场主体,市场竞争严重缺乏。" 11.19
7b618dde44474312be73c85631f9adae ④潜在竞争程度 15 "81-100:项目具有很大市场吸引力,存在较多可参与竞争的市场主体,已有多家市场主体有意向参与,竞争程度激烈; 61-80:项目具有较大市场吸引力,存在较多可参与竞争的市场主体,预计将有多家市场主体参与,竞争程度较高; 41-60:项目市场吸引力一般,存在可参与竞争的市场主体,预计将有一定数量的市场主体参与,竞争程度一般; 21-40:项目缺乏市场吸引力,存在少量竞争的市场主体,预计将有少量市场主体参与,市场竞争不足; 0-20:项目严重缺乏市场吸引力,预计难以找到可参与竞争的市场主体,市场竞争严重缺乏。" 11.25
7b618dde44474312be73c85631f9adae ⑤政府机构能力 10 "81-100:政府具备很强的履约能力,不能履约可能性很小,相关政府部门能很好行驶监督和管理权,能够灵活的转变职能及优化服务; 61-80:政府具备较强的履约能力,不能履约可能性较小,相关政府部门能较好行驶监督和管理权,能够较好的转变只能及优化服务; 41-60:政府具备较强的履约能力,但预计不能履约可能性较大,相关政府部门能基本行使监督和管理权,转变职能及优化服务亦是一般; 21-40:政府履约能力不强,但预计未来将得到改善,相关政府部门行使监督和管理权存在一定困难,在转变职能及优化服务方面较差; 0-20:政府履约能力不强,且预计未来无法改善,不能履约可能性大,相关政府部门无法充分行使监督和管理权,没有转变职能及优化服务的意识。 " 8.9
7b618dde44474312be73c85631f9adae ⑥可融资性 10 "81-100:项目对金融机构吸引力很大,普遍容易获得融资,已有多家金融机构表达意向; 61-80:项目对金融机构吸引力较大,且市场主题融资能力强,较容易获得融资; 41-60:项目对金融机构吸引力一般,且市场主题融资能力不强,可取得更多支持条件获得融资; 21-40:项目对金融机构吸引力较差,且市场主题融资能力不强,不易取得更多支持条件获得融资; 0-20:项目对金融机构吸引力差,且市场主题融资能力不强,融资非常困难。" 8.8
7b618dde44474312be73c85631f9adae ⑦项目规模 10 "81-100:新建项目的投资或存量项目的资产公允价值在10亿元以上; 61-80:新建项目的投资或存量项目的资产公允价值介于2亿到10亿元之间; 41-60:新建项目的投资或存量项目的资产公允价值介于1亿到2亿元之间; 21-40:新建项目的投资或存量项目的资产公允价值介于5000万到1亿元之间; 0-20:新建项目的投资或存量项目的资产公允价值小于5000万元。" 7.56
7b618dde44474312be73c85631f9adae ⑧全生命周期预测准确性 5 "81-100:资产的预期使用寿命大于15年; 61-80:资产的预期使用寿命为11—15年; 41-60:资产的预期使用寿命为6—10年; 21-40:资产的预期使用寿命为3—5年; 0-20:资产的预期使用寿命小于3年。" 4.42
7b618dde44474312be73c85631f9adae ⑨预期使用寿命长短 5 "81-100:项目相关信息表明,项目的全生命周期成本已很好的理解和认识,并且被准确预估的可能性很大; 61-80:项目相关信息表明,项目的全生命周期成本已较好的理解和认识,并且被准确预估的可能性较大; 41-60:项目相关信息表明,项目的全生命周期成本已很好的理解和认识,但尚无法确定能否被准确预估; 21-40:项目相关信息表明,项目的全生命周期成本的理解和认识还不够全面清晰; 0-20:项目相关信息表明,项目的全生命周期成本基本上没有得到理解和认识。" 3.72
2e14e6a54871421f8624dc6e96784269 全生命周期整合程度 15 81-100:项目所有环节都能整合(存量项目:至少有融资和全部运营、维护整合到同一合同中); 61-80:项目所有环节基本完整,绝大部分工作得到整合; 41-60:项目所有环节中不能将设计、运营等某一环节整合; 21-40:项目所有环节中不能将其中的若干环节整合; 0-20:项目所有环节中的各项工作均为独立、分散,无法整合 82.4
2e14e6a54871421f8624dc6e96784269 风险识别与分配 20 81-100:已进行深入的风险识别,各类风险识别全面,预计各类风险都能制定有效的风险应对措施,参与主体具有很好的风险控制和管理能力; 61-80:已进行较为深入的风险识别,各类风险识别较为全面,预计绝大部分风险都将制定有效的风险应对措施,参与主体具有较好的风险控制和管理能力; 41-60:已进行初步的风险识别,各类风险识别尚不够全面,预计一般风险都能制定有效的风险应对措施,参与主体具备基本的风险控制和管理能力; 21-40:已开展了风险识别工作,但未能清晰识别项目中的各类风险,预计少部分风险能制定有效的风险应对措施,参与主体具备较弱的风险控制和管理能力; 0-20:尚未开展风险识别,预计各类风险均无法制定有效的风险应对措施,参与主体具备较差的风险控制和管理能力。 74
2e14e6a54871421f8624dc6e96784269 绩效导向与鼓励创新 10 81-100:围绕公共服务供给数量、质量和效率建立绩效指标,且监测管理机制和激励导向价格设定具有合理性; 61-80:围绕公共服务供给数量、质量和效率建立绩效指标,监测管理机制和激励导向价格设定合理性在可接受范围内; 41-60:部分指标围绕公共服务供给数量、质量和效率建立,监测管理机制和激励导向价格设定合理性在可接受范围内; 21-40:绩效指标设定较为随意,缺乏相关参考依据,监测管理机制和激励导向价格设定不太具有合理性; 0-20:绩效指标设定无市场逻辑,缺乏相关参考依据,监测管理机制和激励导向价格设定超出市场可接受范围。 77.2
2e14e6a54871421f8624dc6e96784269 潜在竞争程度 10 81-100:项目具有很大市场吸引力,存在较多可参与竞争的市场主体,已有多家市场主体有意向参与,竞争程度激烈; 61-80:项目具有较大市场吸引力,存在较多可参与竞争的市场主体,预计将有多家市场主体参与,竞争程度较高; 41-60:项目市场吸引力一般,存在可参与竞争的市场主体,预计将有一定数量的市场主体参与,竞争程度一般; 21-40:项目缺乏市场吸引力,存在少量可参与竞争的市场主体,预计将有少量市场主体参与,市场竞争不足; 0-20:项目严重缺乏市场吸引力,预计难以找到可参与竞争的市场主体,市场竞争严重缺乏。 80
2e14e6a54871421f8624dc6e96784269 政府机构能力 10 81-100:政府具备很强的履约能力,不能履约可能性很小,相关政府部门能很好行使监督权; 61-80:政府具备较强的履约能力,不能履约可能性较小,相关政府部门能较好行使监督权; 41-60:政府具备较强的履约能力,但预计不能履约可能性较大,相关政府部门能基本行使监督权; 21-40:政府履约能力不强,但预计未来将得到改善,相关政府部门行使监督权存在一定困难; 0-20:政府履约能力不强,且预计未来无法改善,不能履约可能性很大,相关政府部门无法充分行使监督权。 82.2
2e14e6a54871421f8624dc6e96784269 可融资性 15 81-100:项目对金融机构吸引力很大,普遍容易获得融资,已有多家金融机构表达意向; 61-80:项目对金融机构吸引力较大,且市场主体融资能力强,较容易获得融资; 41-60:项目对金融机构吸引力一般,且市场主体融资能力不强,可取得更多支持条件获得融资; 21-40:项目对金融机构吸引力较差,且市场主体融资能力不强,不易取得更多支持条件获得融资; 0-20:项目对金融机构吸引力差,且市场主体融资能力不强,融资非常困难。 79.4
2e14e6a54871421f8624dc6e96784269 全生命周期成本估计准确性 10 81-100:运营成本、或有风险能够完全按照市场公允价值进行估算; 61-80:运营成本、或有风险能够绝大部分按照合市场公允价值进行估算; 41-60:运营成本、或有风险部分按照市场公允价值进行估算; 21-40:运营成本、或有风险只能较少部分按照市场公允价值进行估算; 0-20:运营成本、或有风险无法按照市场公允价值进行估算。 76.2
2e14e6a54871421f8624dc6e96784269 项目规模 10 81-100:项目的投资额在20亿元以上; 61-80:项目的投资额在10亿元到20亿元之间; 41-60:项目的投资额在5亿元到10亿元之间; 21-40:项目的投资额在1亿元到5亿元之间; 0-20:项目的投资额小于1亿元。 90.4
50915134b795492ca8bc2fd34130d519 项目规模与复杂度 10 有利(100-81分)、较有利(80-61分)、一般(60-41分)、较不利(40-21分)、不利(20-0分) 93.86
50915134b795492ca8bc2fd34130d519 预期使用寿命 10 有利(100-81分)、较有利(80-61分)、一般(60-41分)、较不利(40-21分)、不利(20-0分) 96.14
603566a9170e4c23936531af1f0f7ec8 全生命周期整合程度 15 81—100=项目资料表明,投资、融资、建造和全部运营、维护将整合到一个合同中;对于存量项目采用PPP模式,至少有融资和全部运营、维护整合到一个合同中。 77

Financial affordability assessment and calculation

Project rid Expenditure Year A-Amount of general public budget expenditure for this project B-Amount of general public budget expenditures for existing management database projects at this level C-Annual General Public Budget Expenditure Amount Percentage (%)
6a2cf8f90fe74d48834bc448e0ffd31a 2020 397880000 17078080000 395008000000 4.42
6a2cf8f90fe74d48834bc448e0ffd31a 2021 397880000 21292640000 431428000000 5.03
6a2cf8f90fe74d48834bc448e0ffd31a 2022 198940000 32736830000 471206000000 6.99
6a2cf8f90fe74d48834bc448e0ffd31a 2023 6726820000 32600020000 514651000000 7.64
6a2cf8f90fe74d48834bc448e0ffd31a 2024 6726820000 32490410000 562102000000 6.98
6a2cf8f90fe74d48834bc448e0ffd31a 2025 6726820000 32353180000 613928000000 6.37
6a2cf8f90fe74d48834bc448e0ffd31a 2026 6726820000 32215980000 670532000000 5.81
6a2cf8f90fe74d48834bc448e0ffd31a 2027 6726820000 16229120000 732355000000 3.13
6a2cf8f90fe74d48834bc448e0ffd31a 2028 6726820000 16093960000 799878000000 2.85
6a2cf8f90fe74d48834bc448e0ffd31a 2029 6726820000 15958790000 873627000000 2.60
6a2cf8f90fe74d48834bc448e0ffd31a 2030 6726820000 15823340000 954175000000 2.36
6a2cf8f90fe74d48834bc448e0ffd31a 2031 6726820000 15966840000 1042150000000 2.18
6a2cf8f90fe74d48834bc448e0ffd31a 2032 6726820000 15556640000 1138236000000 1.96
6a2cf8f90fe74d48834bc448e0ffd31a 2033 6726820000 12642760000 1243181000000 1.56
6a2cf8f90fe74d48834bc448e0ffd31a 2034 6726820000 12644390000 1357803000000 1.43
6a2cf8f90fe74d48834bc448e0ffd31a 2035 6726820000 12646020000 1482992000000 1.31
6a2cf8f90fe74d48834bc448e0ffd31a 2036 6726820000 12647660000 1619724000000 1.20
6a2cf8f90fe74d48834bc448e0ffd31a 2037 6726820000 12648760000 1769063000000 1.10
6a2cf8f90fe74d48834bc448e0ffd31a 2038 6726820000 12649990000 1932170000000 1.00
6a2cf8f90fe74d48834bc448e0ffd31a 2039 6726820000 0 2110316000000 0.32
528ff6133d314c5dbf07eb6f403d132e 2020 3219540000 1232170000 351055000000 1.27
528ff6133d314c5dbf07eb6f403d132e 2021 3219540000 1717980000 379139000000 1.30
528ff6133d314c5dbf07eb6f403d132e 2022 10710100000 2003230000 409471000000 3.10
528ff6133d314c5dbf07eb6f403d132e 2023 10750850000 2288470000 442228000000 2.95
528ff6133d314c5dbf07eb6f403d132e 2024 10794460000 2591460000 477607000000 2.80
528ff6133d314c5dbf07eb6f403d132e 2025 10841130000 2873750000 515815000000 2.66
528ff6133d314c5dbf07eb6f403d132e 2026 11786240000 2873750000 557080000000 2.63
528ff6133d314c5dbf07eb6f403d132e 2027 10944570000 2873750000 601647000000 2.30
528ff6133d314c5dbf07eb6f403d132e 2028 11001850000 2873750000 649778000000 2.14
528ff6133d314c5dbf07eb6f403d132e 2029 11063180000 2873750000 701761000000 1.99
528ff6133d314c5dbf07eb6f403d132e 2030 11128890000 2873750000 757902000000 1.85
528ff6133d314c5dbf07eb6f403d132e 2031 12989580000 2873750000 818534000000 1.94
528ff6133d314c5dbf07eb6f403d132e 2032 11274680000 2873750000 884016000000 1.60
528ff6133d314c5dbf07eb6f403d132e 2033 11355510000 2873750000 954738000000 1.49
528ff6133d314c5dbf07eb6f403d132e 2034 11442140000 2873750000 1031117000000 1.39
dee75d760e3148b2963c84a426f9b592 2021 3202150000 0 451936000000 0.71
dee75d760e3148b2963c84a426f9b592 2022 486050000 0 483571000000 0.10
dee75d760e3148b2963c84a426f9b592 2023 7597070000 0 517421000000 1.47
dee75d760e3148b2963c84a426f9b592 2024 7327070000 0 553640000000 1.32
dee75d760e3148b2963c84a426f9b592 2025 8015000000 0 592395000000 1.35
dee75d760e3148b2963c84a426f9b592 2026 7815150000 0 633863000000 1.23
dee75d760e3148b2963c84a426f9b592 2027 7582150000 0 678233000000 1.12
dee75d760e3148b2963c84a426f9b592 2028 7343150000 0 725710000000 1.01
dee75d760e3148b2963c84a426f9b592 2029 7126910000 0 776509000000 0.92
dee75d760e3148b2963c84a426f9b592 2030 6873910000 0 830865000000 0.83
dee75d760e3148b2963c84a426f9b592 2031 7388910000 0 889026000000 0.83
dee75d760e3148b2963c84a426f9b592 2032 7195570000 0 951257000000 0.76
dee75d760e3148b2963c84a426f9b592 2033 6165560000 0 1017845000000 0.61
dee75d760e3148b2963c84a426f9b592 2034 5905560000 0 1089095000000 0.54
dee75d760e3148b2963c84a426f9b592 2035 5674380000 0 1165331000000 0.49

Prepare text file

Note: The names of the tables shown below are the same as the sample data fields, but the content is different. The sample data only shows the format.

Table name
Value for money evaluation report and the review and approval opinions of the industry authorities at the same level together with the financial department
New construction or renovation and expansion project proposals and approval documents
Feasibility study report or fund application report or project approval report, and documents such as the approval, approval or approval of the above reports by relevant competent authorities; asset evaluation report of existing public assets
Design documents and approval documents
Financial affordability demonstration report and review and approval opinions of the financial department at the same level
Asset evaluation reports of existing public assets or equity and various solutions that may be involved in the transfer of existing assets or equity
The approved project implementation plan and amendments
The government’s approval document for the implementation plan
Authorization document from the people's government at the same level to the implementing agency, that is, the government contracting party of the PPP project contract

Preparation stage text file sample display

Project rid File name File PDF
b5a9b8a3af044ecd9b0910248693544a 2-Rural Pollution Control Project Implementation Plan for Area 2 (2).pdf
b602d2e3d20d44f58a7889445c2bb667 1-Rural pollution control project implementation plan for one area (1).pdf
b602d2e3d20d44f58a7889445c2bb667 Reply for development and reform of a district.pdf
cf79470c0d1c4b55a704fe284204dc70 Description and approval status of PPP project in Congtai Industrial New Town, Congtai District, Handan City, Hebei Province.pdf
7b9ccad604f84805a58f45501a8b90ee Reply on proposal for relocation project of Dafang County No. 1 Middle School in Guizhou Province.pdf
ff4002cdabb1422ea83bac90f478e76e Comprehensive instructions.pdf
ff4002cdabb1422ea83bac90f478e76e Administrative Permit Decision of the Honghe Prefecture Water Conservancy Bureau on Approving the Preliminary Design Report of the Changqiaohai Reservoir Expansion Project in Mengzi.pdf
ed8759b71af246c6bf07dd82dd8adc8d 1 Comprehensive description.pdf
ed8759b71af246c6bf07dd82dd8adc8d 2 Construction Necessity.pdf
ed8759b71af246c6bf07dd82dd8adc8d 4 Project tasks and scale.pdf
ed8759b71af246c6bf07dd82dd8adc8d 5 Main buildings and layout 7.14.pdf
ed8759b71af246c6bf07dd82dd8adc8d 06 Electromechanical and Metal Structure.pdf
ed8759b71af246c6bf07dd82dd8adc8d 8 Construction Organization Design 7.14.pdf
ed8759b71af246c6bf07dd82dd8adc8d 9 Construction land acquisition and resettlement.pdf
ed8759b71af246c6bf07dd82dd8adc8d 10 Environmental Protection Design.pdf
ed8759b71af246c6bf07dd82dd8adc8d 12 Labor Safety and Industrial Hygiene 2017.6.26.pdf
ed8759b71af246c6bf07dd82dd8adc8d 13 Energy-saving design 2017.6.26 (preliminary design).pdf
ed8759b71af246c6bf07dd82dd8adc8d 14 Engineering Management.pdf
ed8759b71af246c6bf07dd82dd8adc8d 16 Economic Evaluation.pdf
ed8759b71af246c6bf07dd82dd8adc8d 3Engineering Geology.pdf
ed8759b71af246c6bf07dd82dd8adc8d 7 Fire Protection Design 2017.6.25.pdf
ed8759b71af246c6bf07dd82dd8adc8d 11 Soil and water conservation design.pdf
ed8759b71af246c6bf07dd82dd8adc8d 15 design budget estimate.pdf
ed8759b71af246c6bf07dd82dd8adc8d Preliminary approval for the eastern river and reservoir water system connection project.pdf
d438bf0cd68a44f69d6dcef2add6db99 Design documents and approval instructions for coal-to-electricity PPP project of Education Bureau of Weichang Manchu and Mongolian Autonomous County, Chengde City, Hebei Province.pdf
744fac3f3e514030a118f8497a76295b This project is not yet completed.pdf
3f51fd7d67034210bb8d5f7a49eaf590 Design file.pdf
99d79330507a4fd8bbda8aa8a0b15872 Design documents and approval.pdf
b924f3f260e74c7ba5f61a5c1d4dead8 Yongzhou Eastern Domestic Waste Incineration Power Plant Project-Preliminary Design-Regional Location Map.pdf
b924f3f260e74c7ba5f61a5c1d4dead8 Yongzhou Eastern Domestic Waste Incineration Power Plant Project-Preliminary Design-General Layout.pdf

Procurement Stage Information Table

Project rid Review opinions of the industry authorities at the project level on the PPP contract to be signed The review opinions of the financial department at the project level on the PPP contract to be signed Review opinions of the legal affairs department at the project level on the PPP contract to be signed Whether the people's government at the project level has approved the PPP contract to be signed Whether the project is approved by the people's government at the same level The review opinions of the people's government at the project level on the inclusion of the government's multi-year fiscal expenditure responsibilities stipulated in the PPP project contract into the medium-term fiscal plan The date when the people's government at the project level shall incorporate the multi-year government fiscal expenditure responsibilities agreed in the PPP project contract into the medium-term fiscal plan The government expenditure responsibility confirmation document or update adjustment document for this project, and the approval document from the People's Congress (or National People's Congress Standing Committee) at the same level to include the fiscal expenditure responsibility for this project in the multi-year budget
4232063bcd9040a28f61c3a358473534 同意 同意 同意 暂无 暂无 暂无 暂无
4d2078327d7d4467942c5d3a37dbb39a 同意 同意 同意 暂无 暂无 暂无 暂无
899831fd8e7241089280e667040eafd3 同意 同意 同意 2019-09-11 暂无 暂无 暂无
a2691b5eb78148ffb01655468edc05ee 同意 同意 同意 2020-07-29 暂无 暂无 暂无
03091cc4d4214ab1a066048a88bf6478 同意 同意 同意 暂无 暂无 暂无 暂无
c8623cd5f8c542c2be28ca4376ff7fae 同意 同意 同意 2020-08-21 通过 2020-08-25 暂无
201d3512aae9422b95091ff48870116b 同意 同意 同意 暂无 暂无 暂无 暂无
ea2ff3aa780549dc93c0ff75167edf20 同意 同意 同意 2020-07-14 通过 2020-07-14 暂无
26d1322dc82f48eeb54ae3b8aad96d74 同意 同意 同意 2018-06-25 通过 2017-07-30 暂无
7711e8c243e944d1b2460612b901aafd 同意 同意 同意 2020-08-14 通过 暂无 暂无
26a4fbb12157416cbec0be8b0a44cfc6 同意 同意 同意 2020-09-15 通过 2020-09-15 暂无
3a8d834ef9fe41bba342f48d9ca00d33 同意 同意 同意 2019-05-30 暂无 暂无 暂无
760d1c46c6994de3bdcee16082e81300 同意 同意 同意 2020-09-03 通过 2020-09-10 暂无
a7819ee8afda41e684dbbc946e362110 同意 同意 同意 2017-07-12 暂无 暂无 暂无
299da6135d0e4093bf44a1b1ed83c615 同意 同意 同意 2020-09-04 通过 2020-09-04 暂无
e3610d9133514013ab47b05a5480d08a 同意 同意 同意 2020-09-21 暂无 暂无 暂无
c9abb1ed41fb45c8bf7564ea38b30665 同意 同意 同意 2020-08-21 通过 2020-09-08 暂无
0a1bd68ba1fc4629be2da36a87034b82 同意 同意 同意 2020-09-10 通过 2020-09-17 暂无
c8912cca57754ad3a6a27d54498a9e21 同意 同意 同意 2020-09-15 通过 2020-09-15 暂无
c008c4a7a1e04771bc1eddac09ae4cf1 同意 同意 同意 2020-08-10 暂无 暂无 暂无
f12ddf1454fd4f6c95a2250ae40a1368 同意 同意 同意 暂无 暂无 暂无 暂无
7f01f7d126704c40b7932947688ca06b 同意 同意 同意 2020-09-02 通过 2020-09-08 暂无
8bee7a789fdf4be5a1ea9c0da88408cf 同意 同意 同意 2020-09-07 通过 2020-09-11 暂无
2d1aa420e9fd4504ba665032713ac372 同意 同意 同意 2020-09-15 通过 2020-09-15 暂无
3c1b3cbd699548eeb0ba6ec76390db18 同意 同意 同意 2020-07-14 通过 2020-07-14 暂无
c73f0a5f70cc4b4da0ba69c2e2201252 同意 同意 同意 2020-09-02 通过 2020-09-02 暂无
0670500ddb7544368762a55415483f61 同意 同意 同意 2020-08-14 通过 暂无 暂无
962a88b50f2a4c09a483f082f8169930 同意 同意 同意 2020-07-30 通过 2020-08-07 暂无
5ee37667d5ba45e886b45952325f8ad5 同意 同意 同意 2020-06-24 通过 2020-07-27 暂无
fa74ea084b12421b8427563ff4f27eed 同意 同意 同意 2020-07-06 通过 2020-07-06 暂无
0d6dd07e46564e6f98e810f7c141bf5b 同意 同意 同意 2020-08-28 通过 2020-09-01 暂无
b7fc046c2b834c23bdeffe9fc45d725f 同意 同意 同意 2020-08-28 通过 2020-08-28 暂无
857e4d557b8e4ab08eb73292d29cf441 同意 同意 同意 2020-06-17 通过 2020-07-24 暂无
975922a203ff4974be80d557373621f5 同意 同意 同意 2017-09-06 通过 2017-09-10 暂无
da4c5addab6e47db8636964a1942ca5c 同意 同意 同意 2020-07-29 通过 2020-05-20 暂无
7e903002ddaf477fafdd4b52727800de 同意 同意 同意 暂无 暂无 暂无 暂无
b0aa2c8b91f543c9ad406d58a0db9507 同意 同意 同意 2020-08-21 暂无 暂无 暂无
ba671239a3a74ed9b3e8cf4f8e0b1ff2 同意 同意 同意 2020-06-08 通过 2020-07-24 暂无
40101923330146ae962f4d4e4d2930aa 同意 同意 同意 2020-08-10 通过 2020-08-10 暂无
25af8f69a3a84e5899062b11b9e7afbf 同意 同意 同意 2020-07-25 通过 2020-08-12 暂无
d41ab72e79e84df588cc4754130cb859 同意 同意 同意 2020-06-30 通过 2020-07-01 暂无
7329f4ad2db844f2ad70586ec8ffe7f6 同意 同意 同意 2020-03-19 通过 2020-07-22 暂无
bdf753b7aec6405dafb3cf7b267ae1ee 同意 同意 同意 暂无 暂无 暂无 暂无
9028750757c64ce1891b9386fe95b625 同意 同意 同意 2020-07-29 通过 2020-05-12 暂无
ccd018efa44a4909aa103527624e3a0e 同意 同意 同意 2020-07-01 通过 2020-06-30 暂无
e8181b99e52845d0a8e62b1f409a764b 同意 同意 同意 2020-07-01 通过 2020-07-21 暂无
91de74f41e3348f9b233ff6165c84d4d 同意 同意 同意 2020-08-12 通过 2020-08-19 暂无
689cfbe500d64ba9a8361f90f9a45318 同意 同意 同意 2020-07-02 通过 2020-07-02 暂无
dd07f34960e348649c4b21dbd7257bf5 同意 同意 同意 2020-08-10 通过 2020-08-19 暂无
b09c5dfb13c6414ba06fbb0f1709344d 同意 同意 同意 2020-07-13 通过 2020-05-11 暂无

Procurement stage text file

Note: The names of the tables shown below are the same as the sample data fields, but the content is different. The sample data only shows the format.

Table name
Project pre-qualification announcement (including pre-qualification application documents)
(Preliminary) Bid Winning, Transaction Result Announcement and Bid Winning Notice
Government authorization documents for adjustments and updates during the project procurement phase
Project procurement documents, addendum documents and answers to clarifying questions
Concluding opinions of pre-qualification expert review and list of pre-qualification experts
Concluding comments of expert review of response documents and list of review experts
Confirm the list of members of the negotiating working group
Signed PPP project contract

Sample display of text documents in the procurement stage

Project rid File name File PDF
ed5c0b1ab08345bda727ef8ed3614143 Negotiating team list.pdf
b5a9b8a3af044ecd9b0910248693544a GXTC-A-1961005-Beijing Fangshan District Rural Sewage Treatment Project (Treatment Station Area 2) PPP Project - Stamped Scanned Copy of Negotiation Memorandum.pdf
b602d2e3d20d44f58a7889445c2bb667 Confirm negotiation team.pdf
632237c639c14ad399e09a94c9080bb7 List of members of the negotiating working group (1).pdf
afdca801041749538e87273341c81048 Procurement result confirmation negotiation memorandum.pdf
4ce81caa43e9481fa23df1be6e14546f PPP Contract Negotiation Memorandum.pdf
72f91375998f4840973e63aeaf14466f Qingzhen City Rural Environment Comprehensive Improvement PPP Project-Confirmation of Negotiation Working Group Member List.pdf
498482d6671b4341bc0ca8b76f9ca242 Qinglong County Water Affairs Integrated Construction Project (Phase I) Negotiation Working Group Sign-in Form.pdf
7201da73fee54ba69470e7cd40a96370 Confirm the list of members of the negotiating working group.pdf
ff456f272a154ad89a74130c0fdf23df Sign-in form.pdf
987bbf1ddb224ec28510eae87dc5fd89 20191119 Confirmation of the list of members of the negotiation working group.pdf
cf79470c0d1c4b55a704fe284204dc70 Purchase Result Confirmation Negotiation Sign-in Form for PPP Project in Congtai Industrial New Town, Congtai District, Handan City, Hebei Province.pdf
2c8154fd558d4194bd8f2ac5905fd212 Confirm negotiation work list.pdf
7b9ccad604f84805a58f45501a8b90ee Announcement on Winning Bid for PPP Project of Relocation and Supporting Facilities of No. 1 Middle School in Dafang County, Guizhou Province.pdf
85d9c5d041d34aa597f97eabac5d18a5 Confirm Negotiation Working Group Sign-in Form (2019.9.12).pdf
ff4002cdabb1422ea83bac90f478e76e Confirm the list of members of the negotiation working group; (Confirm negotiation sign-in form).pdf
ed8759b71af246c6bf07dd82dd8adc8d Negotiation Memorandum (2).pdf
5e598d5d94e144b994d8f35f23ccc68c No. 3 of the Mengzi Municipal Government Office (2019) No. 3 Mengzi Municipal People’s Government Office on the establishment of the government and social capital cooperation (PPP) project contract negotiation leading group for the centralized water supply project in three towns and four townships in Mengzi City (1).pdf< /td>
da672d82d60b43caa8353520aac29c99 Confirm the list of negotiating working groups.pdf
d438bf0cd68a44f69d6dcef2add6db99 Memorandum of Negotiation on the Coal-to-Electricity PPP Project of the Education Bureau of Weichang Manchu and Mongolian Autonomous County, Chengde City, Hebei Province.pdf
d438bf0cd68a44f69d6dcef2add6db99 List of confirmation and negotiation working group for coal-to-electricity PPP project of Education Bureau of Weichang Manchu and Mongolian Autonomous County, Chengde City, Hebei Province.pdf
c3e712120dea4e438f2a823efe096d4e List of negotiating team members.pdf
183d47e2160c4c188fad3e4d976e8338 Negotiation memorandum.pdf
284e745faa614182bcb14768729501fe Negotiation memorandum.pdf
e412990af8794d7cb532fd5c5a3354d6 17. Xifeng County Urban and Rural Environmental Sanitation Integration PPP Project Social Capital Procurement_Negotiation Memorandum.pdf
753ba3e987d9471487c492ff8dd622ef Members of the negotiating team.pdf
744fac3f3e514030a118f8497a76295b Contract Negotiation Memorandum.pdf
3f51fd7d67034210bb8d5f7a49eaf590 Negotiating team list.pdf
54209970177d41808044d7ce61ecea48 5. Nanming District Renmin Avenue Phase II and supporting projects PPP project procurement results confirmation negotiation memorandum (including list).pdf

Execution phase information table

Project rid Project company name/social capital party name The establishment time of the project company/the establishment time of the social capital party Registered capital of the project company/registered capital of the social capital party
975922a203ff4974be80d557373621f5 凤山博世科环境投资有限公司 2017-09-14 2600000000
80f97bd3c6294b4595a44c1e32b9053a 南京玖生湶环保工程有限公司 2020-05-13 3490000000
92deb351e55c441a9f3cee8d588c8154 黄山泰达通源环保有限公司 2019-04-26 2100000000
adef94040b754153ad5f482a25e901f3 淄博市宏嘉建设投资有限公司 2020-07-16 10000000000
363e2e83e9464caf9b125f837718fbf7 南昌市青美市政建设工程有限公司 2017-11-03 10000000000
285340e3f1444a37b45eac4aaaddbe63 枣强县智慧城市信息技术服务有限公司 2018-07-20 6225690000
d2766df91e704163b5dcdbadcd365b59 黑河市五汤公路投资建设有限公司 2020-03-12 12797470000
e189aa8e1553456c8c887099df7bc0ea 萍乡市国蕾建设工程有限公司 2020-04-22 12816190000
e189aa8e1553456c8c887099df7bc0ea 萍乡市国蕾建设工程有限公司 2020-04-22 12816190000
42812b735fb84c398d012b9450c5b703 香河康恒再生能源有限公司 2019-09-24 9136510000
42812b735fb84c398d012b9450c5b703 香河康恒再生能源有限公司 2019-09-24 9136510000
dd42cfa37fea4955b2c5e99a599da18d 宜春三力置业发展有限公司 2019-09-09 800000000
0a2738c445ce4a24bb5222d4f3ec9d17 乌鲁木齐中铁元水环保有限公司 2018-11-29 3075000000
f6a92824a87c4915b03bcb8a90cdf9e9 开远市南洞旅游投资开发有限公司 2018-03-30 40290950000
9299cc184a1e4994b852598a25033cd4 芒市等薄水源建设投资有限公司 2020-05-13 8778430000
6641db91d86f46829fb9a95f079fc803 中节能(嘉鱼)环境服务有限公司 2019-11-21 1044000000
13178cdc14864e3bbca91df7daeaae37 西安白鹿原益恒环境能源有限公司 2020-02-11 31713960000
cf79470c0d1c4b55a704fe284204dc70 邯郸鼎兴园区建设发展有限公司 2016-11-25 110000000000
85d9c5d041d34aa597f97eabac5d18a5 兴宁康恒环保能源有限公司 2019-11-07 11288030000
51b37f294b9541578488cf6533a1a7b3 贵州贵金高速公路有限公司 2020-03-12 20000000000
ed8759b71af246c6bf07dd82dd8adc8d 蒙自市恒源供水有限公司 2019-01-24 1000000000
da672d82d60b43caa8353520aac29c99 呼和浩特市新联项目管理有限公司 2019-11-21 10000000000
53789f3d62844b47a3169236610f9d60 黑河市沈发餐厨废弃物利用有限公司 2019-11-19 576370000
18632189897c4e0987066b47fe8da7b7 尚志市地铁玉禾田环境事业发展有限公司 2019-12-09 300000000
753ba3e987d9471487c492ff8dd622ef 中电建成都双流道路建设有限公司 2017-01-19 8006000000
b924f3f260e74c7ba5f61a5c1d4dead8 光大环保能源(宁远)有限公司 2019-03-12 14915310000
8e882feb978849e2ad3e217ba717eb09 清河县环中水务有限公司 2020-03-10 3216820000
dc90fd1066bf438d90bd20127052da86 固镇县宏元道路项目管理有限公司 2020-03-15 3745800000
ec898e5d79b645dd9671a4d5e49b1d02 宁波杭州湾新区水艺污水处理有限公司 2019-12-25 12721040000
88eea5869bec46d2bfcad08de9bae919 宁波良麒光艺环境技术有限公司 2019-12-19 8000000000
c2147b0cb43c4885a25aa27212bc0ede 光大环保能源(蓝田)有限公司
ddd525434fbe449384cf7dfe30885adf 常州新瑞建设发展有限公司 2018-07-11 4160000000
8ac2aa03bdd1488b919207bd40d8ba97 兴宁市盛绿环保有限公司 2018-09-29 4200000000
90e82cef6f16469988ab084465aded8f 瀚蓝(廊坊)生物环保科技有限公司 2020-03-10 5024780000
ff40651de0b04a89a553d2c29a7a6488 唐山市保利青少年宫企业管理有限公司 2019-11-28 300000000
c51b19d801064c32b775e68c0e736985 奎屯中智达环保科技有限公司 2019-06-20 973650000
d2fe84e247bc42fe9ca1bdd4c38ccd6c 昌邑泰达环保有限公司 2020-01-02 11421180000
b1941bd897344a5db948058df9192607 甘肃公航旅历史街区建设投资有限公司 2019-09-16 72297890000
8b95bf1d6b79437a85c10fda0facf283 天津津沧公路建设有限公司
ad2983b6ffda45ffa3d658fe10c4ea32 台山市裕登农产品示范园开发建设有限公司 2019-08-13 3000000000
1d63ee96a2944fe3a5208d254ac61449 广州庆盛产业园开发管理有限公司 2019-08-29 10000000000
e3e8c191ba8741149abe2cad68be1300 唐山云之苑综合管理服务有限公司 2019-05-29 50000000000
435a79d63b634074bf262beac0abdee2 淮南首创环境治理有限公司 2019-11-07 11241000000
6731b243028a4abd859ca6fa230f107c 开封开信水务有限公司 2020-01-21 7700000000
5ac9136b3fca4d06b6458281246bd9fc 北京怀柔北排水环境技术发展有限公司
fed2c2ebc83c4d4b84655dc87ba7d3a9 淇县青源园林绿化工程有限公司 2019-12-10 10000000000
1d6fb12c6e4f4a1f9f0d1fce5748876f 黑龙江省浚泽工程项目管理有限公司 2020-01-21 12261350000
58ebc9b689ff4c9583224b0ae46ab1d9 平山县尚河建设项目管理有限公司
b44712fb620f44b1b49612934128314d 陕西环保集团水环境(黄陵)有限公司 2020-01-08 3750000000
35d3ecd5b8a0434086eff1c5428158c2 东莞市东泽水环境投资有限公司 2018-08-24 222105020000

Shareholder subscription

Project rid Serial number Name of shareholder Government or social capital Amount of investment Equity ratio (%)
975922a203ff4974be80d557373621f5 1 广西博世科环保科技股份有限公司 社会资本 2470000000 95
975922a203ff4974be80d557373621f5 2 凤山县城乡建设投资发展有限责任公司 政府 130000000 5
80f97bd3c6294b4595a44c1e32b9053a 1 南京玖生环保科技有限公司 社会资本 3490000000 100
92deb351e55c441a9f3cee8d588c8154 1 天津泰达环保有限公司 社会资本 1470000000 70
92deb351e55c441a9f3cee8d588c8154 2 安徽省通源环境节能股份有限公司 社会资本 630000000 30
adef94040b754153ad5f482a25e901f3 1 上海宏信建设投资有限公司 社会资本 9000000000 90
adef94040b754153ad5f482a25e901f3 2 中铁十四局集团有限公司 社会资本 500000000 5
adef94040b754153ad5f482a25e901f3 3 山东慧达城市建设发展有限公司 政府 500000000 5
363e2e83e9464caf9b125f837718fbf7 1 南昌昌南城市建设投资发展有限公司 政府 1000000000 10
363e2e83e9464caf9b125f837718fbf7 2 江西省建工集团有限责任公司 社会资本 100000000 1
363e2e83e9464caf9b125f837718fbf7 3 南昌水利投资发展有限公司 社会资本 8900000000 89
285340e3f1444a37b45eac4aaaddbe63 1 北京中电兴发科技有限公司 社会资本 6225690000 100
d2766df91e704163b5dcdbadcd365b59 1 黑龙江省交投公路建设投资有限公司 社会资本 6396180000 49.98
d2766df91e704163b5dcdbadcd365b59 2 黑河市国有投资控股集团有限公司 政府 6270760000 49
d2766df91e704163b5dcdbadcd365b59 3 黑龙江省八达路桥建设有限公司 社会资本 65270000 0.51
d2766df91e704163b5dcdbadcd365b59 4 黑龙江龙捷市政轨道交通工程有限公司 社会资本 65270000 0.51
a2453c9b2b0c4d5f8168e872ad48a047 1 甘肃正泰建筑工程有限公司 社会资本 674810000 90
a2453c9b2b0c4d5f8168e872ad48a047 2 玉门市融鑫城市建设开发有限公司 政府 74980000 10
e189aa8e1553456c8c887099df7bc0ea 1 萍乡市国有资产经营有限责任公司 社会资本 10252950000 80
e189aa8e1553456c8c887099df7bc0ea 2 萍乡市湘东区麻山生态新区开发建设投资有限公司 政府 2563240000 20
e189aa8e1553456c8c887099df7bc0ea 1 萍乡市国有资产经营有限责任公司 社会资本 10252950000 80
e189aa8e1553456c8c887099df7bc0ea 2 萍乡市湘东区麻山生态新区开发建设投资有限公司 政府 2563240000 20
42812b735fb84c398d012b9450c5b703 1 上海康恒环境股份有限公司 社会资本 8679680000 95
42812b735fb84c398d012b9450c5b703 2 香河县公有资产经营公司 政府 456830000 5
42812b735fb84c398d012b9450c5b703 1 上海康恒环境股份有限公司 社会资本 8679680000 95
42812b735fb84c398d012b9450c5b703 2 香河县公有资产经营公司 政府 456830000 5
dd42cfa37fea4955b2c5e99a599da18d 1 宜春市新城建设发展有限公司 社会资本 800000000 100
0a2738c445ce4a24bb5222d4f3ec9d17 1 中铁一局集团有限公司 社会资本 2075000000 67.48
0a2738c445ce4a24bb5222d4f3ec9d17 2 新疆元水建设开发(集团)有限公司 政府 1000000000 32.52
f6a92824a87c4915b03bcb8a90cdf9e9 1 开远市南洞旅游投资开发有限公司 19003930000 21.84
9299cc184a1e4994b852598a25033cd4 1 云南建设基础设施投资股份有限公司 社会资本 6934960000 79
9299cc184a1e4994b852598a25033cd4 2 云南省水利水电工程有限公司 社会资本 87780000 1
9299cc184a1e4994b852598a25033cd4 3 芒市水务发展投资管理有限公司 政府 1755690000 20
ce28526ba5074b9899a71898571309b2 1 彭泽县城市发展建设集团有限公司 政府 500000000 5
ce28526ba5074b9899a71898571309b2 2 长江生态环保集团有限公司 社会资本 5858000000 58.58
ce28526ba5074b9899a71898571309b2 3 北京首创股份有限公司 社会资本 2000000000 20
ce28526ba5074b9899a71898571309b2 4 中国建筑第二工程局有限公司 社会资本 1000000000 10
ce28526ba5074b9899a71898571309b2 5 中国水利水电第八工程局有限公司 社会资本 612000000 6.12
ce28526ba5074b9899a71898571309b2 6 上海市城市建设设计研究总院(集团)有限公司 社会资本 20000000 0.2
ce28526ba5074b9899a71898571309b2 7 中国电建集团中南勘测设计研究院有限公司 社会资本 10000000 0.1
6641db91d86f46829fb9a95f079fc803 1 中节能(山东)环境服务有限公司 社会资本 1033560000 99
6641db91d86f46829fb9a95f079fc803 2 嘉鱼县城镇建设投资有限公司 政府 10440000 1
13178cdc14864e3bbca91df7daeaae37 1 西安环益再生资源利用有限公司 社会资本 21565490000 68
13178cdc14864e3bbca91df7daeaae37 2 上海康恒环境股份有限公司 社会资本 7928490000 25
13178cdc14864e3bbca91df7daeaae37 3 西安白鹿原现代农业投资发展有限公司 政府 1585700000 5
13178cdc14864e3bbca91df7daeaae37 4 陕西建工第七建设集团有限公司 社会资本 634280000 2
7f6efcbb6e6f4815818829fc0508306b 1 承德木兰林业集团有限责任公司 社会资本 13050000000 100
cf79470c0d1c4b55a704fe284204dc70 1 九通基业投资有限公司 社会资本 110000000000 100.00
85d9c5d041d34aa597f97eabac5d18a5 1 上海康恒环境股份有限公司 社会资本 11288030000 100
51b37f294b9541578488cf6533a1a7b3 1 贵州交通建设集团有限公司 政府 150000000000 23.01

Project construction progress

Project rid Serial number Time Construction progress description Corresponding contract reservation terms Is it consistent
363e2e83e9464caf9b125f837718fbf7 1 2019-11-17 建设完成进行竣工验收 第六节工程建设
0a2738c445ce4a24bb5222d4f3ec9d17 1 2018-09-05 开工建设 符合约定
0a2738c445ce4a24bb5222d4f3ec9d17 2 2019-04-23 主体工程完成 符合约定
c51b19d801064c32b775e68c0e736985 1 2019-12-13 整体项目建设已完成,阳光棚和设备的调试正在进行 奎屯市污水处理改扩建(二期)及配套工程PPP项目
c84c46558fe34b2c9458922b36ddabdd 1 2019-03-20 符合进度 2.1.1
3ff457a96a4b4730a95d46334ac43f60 1 2017-12-15 正常 ppp项目合同11.01条款
3ff457a96a4b4730a95d46334ac43f60 2 2018-06-07 延误 ppp项目合同11.01条款
3ff457a96a4b4730a95d46334ac43f60 3 2018-06-12 正常 ppp项目合同11.01条款
3ff457a96a4b4730a95d46334ac43f60 4 2018-07-11 正常 ppp项目合同11.01条款
3ff457a96a4b4730a95d46334ac43f60 5 2018-08-16 正常 ppp项目合同11.01条款
3ff457a96a4b4730a95d46334ac43f60 6 2018-09-15 正常 ppp项目合同11.01条款
3ff457a96a4b4730a95d46334ac43f60 7 2018-10-10 正常 ppp项目合同11.01条款
bc1de8b2d7f04bc2bd1c9d81b24ad235 1 2017-10-26 已全部完工 PPP合同
1df8ce2f3be04b9a86d6f01a2ccf4d9b 1 2018-05-10 污水处理厂主体完工 项目公司应及时组织制订本项目工程进度计划,进度计划应包括但不限于:施工计划、资金支出计划、设备及大宗材料采购计划等计划
1df8ce2f3be04b9a86d6f01a2ccf4d9b 2 2018-06-15 管网铺设完成 项目公司应及时组织制订本项目工程进度计划,进度计划应包括但不限于:施工计划、资金支出计划、设备及大宗材料采购计划等计划
1df8ce2f3be04b9a86d6f01a2ccf4d9b 3 2018-08-08 工程竣工验收 竣工验收应根据本合同、工程承包协议所约定的规范、标准、程序以及相关行政主管部门的规定进行,严格遵守适用法律规定
0066b914a1f440e494a47fe01fa246dc 1 2019-09-30 主体工程建成 合同总则1.1.10款
b8c26edac2714b0ea82e86b079b62bfd 1 2017-05-28 一标段完成施工合同内容施工 一标段施工合同
b8c26edac2714b0ea82e86b079b62bfd 2 2017-05-30 二标段完成施工合同内容施工 二标段施工合同
1d77d179345246e8841f051971b64057 1 2019-01-16 建设完工 9.5.1
013ba2492a0840849a503561d74b17ff 1 2019-03-01 完成45%工程量
013ba2492a0840849a503561d74b17ff 2 2019-09-02 建设完成,等待试运营点火
013ba2492a0840849a503561d74b17ff 3 2019-09-19 通过试运营
9d41d015432d4e48945a56611eb331a3 1 2019-09-01 全部完成 合同
524f26410f214644bc21b23b8e3d8f76 1 2018-01-04 开工建设 第八条、第十一条
524f26410f214644bc21b23b8e3d8f76 2 2018-11-20 主体完工 第八条、第十一条
524f26410f214644bc21b23b8e3d8f76 3 2019-03-12 主体装修 第八条、第十一条
524f26410f214644bc21b23b8e3d8f76 4 2019-06-30 主体完工初验 第八条、第十一条
524f26410f214644bc21b23b8e3d8f76 5 2019-08-29 竣工验收 第八条、第十一条
f0eb77bf435b40209acf90ae047e26d6 1 2018-11-09 进场开工 第7.7.1条,开工日为2018年11月8日
f0eb77bf435b40209acf90ae047e26d6 2 2019-10-31 道路部分全部完工 第7.7.1条,完工日为2019年10月31日
f0eb77bf435b40209acf90ae047e26d6 3 2019-12-15 枢纽部分全部完工,工程整体完工 第7.7.1条,完工日为10月31日
8a07858a35734c60b3886b0ad4cdb13c 1 2019-08-25 内外墙、门窗拆除,内外墙粉刷,水、电路改造 6.1.1
8a07858a35734c60b3886b0ad4cdb13c 2 2018-12-31 购入3吨垃圾车10辆、1吨勾臂车11辆、微型扫路车10辆、8吨垃圾车5辆、电动保洁车55辆、机械设备10台、清洗车39台、装载机1台、多功能抑尘车1辆,辅助车3辆,电子办公设备40台、 6.1.1
8a07858a35734c60b3886b0ad4cdb13c 3 2019-12-31 垃圾车4辆、机械设备5台、辅助车1台、电子设备2台 6.1.1
8a07858a35734c60b3886b0ad4cdb13c 14 2019-12-23 洗车平台 6.1.1
8a07858a35734c60b3886b0ad4cdb13c 15 2019-09-12 大渔果皮箱维修 6.1.1
8a07858a35734c60b3886b0ad4cdb13c 16 2020-04-08 三相动力表安装 6.1.1
8a07858a35734c60b3886b0ad4cdb13c 17 2020-04-19 大渔转运站垃圾转运场场地维修 6.1.1
8a07858a35734c60b3886b0ad4cdb13c 18 2020-06-17 垃圾压缩转运作业区 6.1.1
8a07858a35734c60b3886b0ad4cdb13c 19 2020-08-17 电动保洁车4辆、铺助车辆1辆、维修设备2个、电子设备5台 6.1.1
d47b40e166a24c469a260e165f30d0fe 1 2018-05-15 完成19%
d47b40e166a24c469a260e165f30d0fe 2 2018-07-15 完成42%
d47b40e166a24c469a260e165f30d0fe 3 2018-09-15 完成63%
d47b40e166a24c469a260e165f30d0fe 4 2018-11-15 完成90%
d47b40e166a24c469a260e165f30d0fe 5 2018-12-31 完成100%
0c3dcfbb51434ed892c9e72a830116f3 1 2018-12-25 房屋建筑和市政基础设施工程竣工验收备案表 "7.4 项目进度 双方应在下列项目时间表预计的有关进度日期当日或之前履行其在本协议项下的义务"
d6ebc9aece3e40e9bcc9a73cda1c5ab8 1 2019-01-23 交工验收完成 第26.1条
f84e4590147c49f398e0dffd2fc0209d 1 2017-09-07 开工 3.3.3合同生效,且项目具备建设条件之日
f84e4590147c49f398e0dffd2fc0209d 2 2018-02-28 项目建设完成 3.3.3自乙方开始进入项目建设期起半(0.5)年届满之日

Project quality compliance inspection status

Project rid Serial number Time Project quality inspection status Corresponding contract reservation terms Is it consistent
363e2e83e9464caf9b125f837718fbf7 1 2019-11-17 质量合格 第六节工程建设
0a2738c445ce4a24bb5222d4f3ec9d17 1 2019-04-01 符合质量要求 符合
c51b19d801064c32b775e68c0e736985 1 2019-12-13 整体验收合格 奎屯市污水处理改扩建(二期)及配套工程PPP项目
c84c46558fe34b2c9458922b36ddabdd 1 2019-08-23 合格 5.1
3ff457a96a4b4730a95d46334ac43f60 1 2018-10-10 项目完工预验收 PPP项目合同16.01条款
3ff457a96a4b4730a95d46334ac43f60 2 2019-11-22 项目竣工验收 PPP项目合同16.01条款
bc1de8b2d7f04bc2bd1c9d81b24ad235 1 2017-10-26 合格 PPP项目施工合同
0066b914a1f440e494a47fe01fa246dc 1 2019-09-30 主体工程检查合格 第五章项目建设、移交5.5.2乙方的主要义务第(6)条
b8c26edac2714b0ea82e86b079b62bfd 1 2017-10-23 完成竣工验收 所有条款
1d77d179345246e8841f051971b64057 1 2018-08-07 合格 9.4.4
9d41d015432d4e48945a56611eb331a3 1 2019-09-01 符合要求 合同
524f26410f214644bc21b23b8e3d8f76 1 2018-05-15 施工组织设计 第八条
524f26410f214644bc21b23b8e3d8f76 2 2018-12-07 基础分部验收 第八条
524f26410f214644bc21b23b8e3d8f76 3 2019-06-04 主体分部验收 第八条
524f26410f214644bc21b23b8e3d8f76 4 2019-06-30 主体初验 第八条
524f26410f214644bc21b23b8e3d8f76 5 2019-08-29 主体竣工验收 第八条
e5dc514dde1d49e4b59c6ca9367ed832 1 2018-06-30 盛泉大街、柏城渡槽路、官周路、北胶新河大坝路、富泉大街、下海路(高双路-双井路)、姚前路、柴沟大梁路均达到合格级
e5dc514dde1d49e4b59c6ca9367ed832 2 2018-12-28 律王路王吴三孔桥、下海路三皇屯村涵洞质量达到合格级
1a5a90fa39ac44e4b528b4dbfa246cc5 1 2019-01-04 北平路(大牟家镇驻地段)、高城路(南外环-故献大桥)、姜庄惠和路-辛河东路工程质量合格
1a5a90fa39ac44e4b528b4dbfa246cc5 2 2018-07-07 横一路(下海路-井沟)、醴泉石泉街-永吉路、葛家大浒红绣河桥、井沟园区规划路(九支路-安家屯)、李家太洛南桥加宽、阚兴大道(高双路-松兴屯)、阚兴大道(高双路-松兴屯)、夏庄大街(高东路-北村后路)、咸家旗东路(利华前街-18号路)工程质量合格
1a5a90fa39ac44e4b528b4dbfa246cc5 3 2019-01-05 大寨路西延(田注路-滨河大道)、横一王吴泄洪渠交通桥工程质量合格
f0eb77bf435b40209acf90ae047e26d6 1 2019-12-15 工程通过竣工验收 第8.1.1条
8a07858a35734c60b3886b0ad4cdb13c 1 2019-07-30 内外墙、门窗拆除,内外墙粉刷,水、电路改造符合建筑工程施工质量验收统一标准 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 2 2018-12-31 2018年度环卫专用车辆设备的购置和更新质量合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 3 2019-12-31 2019年度环卫专用车辆设备的购置和更新质量合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 4 2018-07-31 采购垃圾桶1100个、果皮箱70个、果皮箱内胆1200个、塑料桶盖100个质量合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 5 2018-08-28 湖滨路、前兴路与海润路水表安装工程质量合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 6 2018-09-21 渔户村硬化路面钢板、渗透液罐及铺设沙石费工程质量合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 7 2018-07-06 场地平整、搭接动力、搭建维修车间和充电车棚、搭建维修车间和充电车棚地面硬化工程质量合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 8 2019-05-23 观景路公厕工具箱验收合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 9 2019-10-14 渔户村停车场宿舍淋浴房验收合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 10 2019-10-19 渔户村新建洗车平台、泥沙池、三级沉降池、水沟、围墙及地面硬化施工维修费验收合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 11 2019-11-21 观景路公厕指示牌及标牌质量合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 12 2019-11-25 渔户村垃圾污水池及垃圾压缩区路面铺设验收合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 13 2019-12-23 wps.办公云平台、微软软件Windows、辛巴汽修云旗舰版软件合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 14 2019-12-23 渔户村停车场洗车平台验收合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 15 2020-01-15 大渔果皮箱维修验收合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 16 2020-04-21 渔户村三相动力表安装合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 17 2020-05-15 大渔转运站垃圾转运场场地维修验收合格 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 18 2020-07-01 双河湾垃圾压缩转运作业区 第二章第六节第二十二条
8a07858a35734c60b3886b0ad4cdb13c 19 2020-07-31 2020年1-7月环卫专用车辆设备的购置和更新质量合格 第二章第六节第二十二条
0c3dcfbb51434ed892c9e72a830116f3 1 2018-12-25 房屋建筑和市政基础设施工程竣工验收通知书 "7.4 项目进度 双方应在下列项目时间表预计的有关进度日期当日或之前履行其在本协议项下的义务"
0c3dcfbb51434ed892c9e72a830116f3 2 2018-12-25 房屋建筑和市政基础设施工程竣工验收备案表 "7.4 项目进度 双方应在下列项目时间表预计的有关进度日期当日或之前履行其在本协议项下的义务"
0c3dcfbb51434ed892c9e72a830116f3 3 2018-12-25 云南省基础设施工程竣工验收合格证明书 "7.4 项目进度 双方应在下列项目时间表预计的有关进度日期当日或之前履行其在本协议项下的义务"
0c3dcfbb51434ed892c9e72a830116f3 4 2019-01-25 云南省建筑工程质量检查报告 "7.4 项目进度 双方应在下列项目时间表预计的有关进度日期当日或之前履行其在本协议项下的义务"
d6ebc9aece3e40e9bcc9a73cda1c5ab8 1 2019-01-23 交工验收通过,项目合格 第26.1条
f84e4590147c49f398e0dffd2fc0209d 1 2018-09-06 完成环评验收 7.18环保验收
f84e4590147c49f398e0dffd2fc0209d 2 2018-09-18 完成竣工验收 7.8质量保证和质量控制
59d856f7920d453ca028a927a098bff9 1 2019-09-10 玉溪市公路工程质量监督站对江通高速公路工程进行了交工验收核验工作,并形成了交工验收工程质量检测核验意见,经检测的工程项目质量合格。 根据江川至通海高速公路项目政府和社会资本合作(PPP)项目合同第18条交工验收与竣工验收的规定进行
2dd2e9588f4b412f868881e11f9bcb17 1 2019-05-15 学生宿舍楼符合建设质量规范及要求 学生宿舍建设工程施工合同第二部分 通用合同条款 5/5.1/5.2/5.3/5.4/5.5

Project cost and other compliance inspections

Project rid Serial number Time Project quality inspection status Corresponding contract reservation terms Is it consistent
0a2738c445ce4a24bb5222d4f3ec9d17 1 2019-04-01 符合造价要求 符合
c51b19d801064c32b775e68c0e736985 1 2020-01-20 情况属实 奎屯市污水处理改扩建(二期)及配套工程PPP项
c84c46558fe34b2c9458922b36ddabdd 1 2020-03-20 合格
bc1de8b2d7f04bc2bd1c9d81b24ad235 1 2017-10-26 合格 PPP项目施工合同
0066b914a1f440e494a47fe01fa246dc 1 2019-03-28 安徽盛唐工程咨询集团有限公司正在编制项目工程量清单及控制价 第5章5.4中关于工程结算条款
b8c26edac2714b0ea82e86b079b62bfd 1 2017-11-17 由青海省财政投资评审中心完成建设工程竣工决算评审报告 大通县文化广场改造及地下停车场建设工程竣工决算评审报告
1d77d179345246e8841f051971b64057 1 2020-03-11 合格 9.14
9d41d015432d4e48945a56611eb331a3 1 2019-09-01 符合要求 合同
10a801f47e5743249cd7c3f16b5a6d9f 1 2017-04-25 截止2017年4月25日完成投资额7312.18万元
10a801f47e5743249cd7c3f16b5a6d9f 2 2017-09-20 截止2017年9月20日完成投资额19586.25万元
10a801f47e5743249cd7c3f16b5a6d9f 3 2018-07-08 截止2018年7月8日完成投资额25392.88
524f26410f214644bc21b23b8e3d8f76 1 2018-03-05 工程量清单
8a07858a35734c60b3886b0ad4cdb13c 1 2019-07-30 2019年大渔垃圾中转站及站内公厕提升改造合格 第一章1.5.2
f84e4590147c49f398e0dffd2fc0209d 1 2018-09-30 工程审计报告 7.19项目投资的确定
f84e4590147c49f398e0dffd2fc0209d 2 2018-10-09 工程竣工财务决算审计报告 7.19项目投资的确定
59d856f7920d453ca028a927a098bff9 1 2020-03-09 由玉溪市交通运输局作为委托人,通过公开招标完成了江通项目过程审计(含结算审核、建设期绩效评价、竣工财务决算审计咨询)招标。审计单位已于2020年3月9日进场,先期开展江通高速与弥玉高速共线段结算审计工作,计划2020年5月上旬完成共线段工程结算审核,计划2020年7月底完成全线工程结算审核。 根据江川至通海高速公路项目政府和社会资本合作(PPP)项目合同第11条项目概算及投资总额的规定
7b59c0ff6aa74eec950a6d6095961e23 1 2017-09-12 第01期中间计量批复11179891元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 2 2017-10-24 第02期中间计量批复5323483元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 3 2017-10-24 第03期中间计量批复3572484元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 4 2017-12-18 第04期中间计量批复4616701元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 5 2017-12-18 第05期中间计量批复11278384元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 6 2017-12-25 第06期中间计量批复4469540元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 7 2017-12-25 第07期中间计量批复16597755元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 8 2018-02-05 第08期中间计量批复23182293元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 9 2018-03-05 第09期中间计量批复11897052元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 10 2018-04-18 第10期中间计量批复11360009元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 11 2018-05-25 第11期中间计量批复3249270元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 12 2018-06-12 第12期中间计量批复12164607元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 13 2018-07-31 第13期中间计量批复5919313元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 14 2018-08-14 第14期中间计量批复12865374元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
7b59c0ff6aa74eec950a6d6095961e23 15 2019-04-03 第15期中间计量批复22750033元 PPP合作协议第十一条 施工建设 第11.6条款 造价控制
f7e79f872e9b40af9e3c69cbc6207443 1 2017-12-27 鼎城区财政局高新分局对工程概算进行了审核
4dbbd90e59d343bda4c67ca01429c06e 1 2020-03-18 正常
6e39b0cd07b0456d88a16cad3fa1aab7 1 2017-12-09 预算审核建安工程造价为37395万元。对比原估算19677万元,增加造价17718万元。
ee4f3be222fb4fa2bf370828ab8cb8f9 1 2019-05-30 合格 二十五条
56cc56fb043c444aae08c44c84ec0075 1 2018-03-31 良好 特许经营协议
d1fa09a95165496c88938dfdf0859442 1 2018-05-31 符合规定要求 23.1
d43119df598c4b9288ebb4b35f0e6545 1 2019-11-30 符合合同规定,在投资控制价内 PPP项目合同第八条
93bb0887c18b4c11a2f872ef8410a2f9 1 2020-01-20 主体工程竣工结算 9.18资金管理
11e6d970c1d24a968f8a4a83beac89a5 1 2017-11-25 工程审定额为79888304.88元 竣工决算最终以审计部门审计结果为准
0a9ed6f26f9c4c91ac66e68375a6e949 1 2019-07-26 符合 第七章
0195d169f6c44c5284a2cc167249bd78 1 2019-05-08 第三方北京筑标建设工程咨询有限司出具结算审核报告 28条实际投资认定 本项目最终投资以经第三方审计机构审核的最终竣工决算金额为准。
0195d169f6c44c5284a2cc167249bd78 2 2019-06-30 第三方黑龙江龙顺达会计师事务所有限责任公司出具竣工财务决算审核报告 实际投资认定 本项目最终投资以经第三方审计机构审核的最终竣工决算金额为准。
8b67684e12e049c392ecce0dc9547abb 1 2019-01-11 费县许家崖水库水源地生态保护工程PPP项目—水源地标准化建设、生态修复与保护、能力建设工程是经费县人民政府(费政字【2017】116号)批准的政府与社会资本方合作采购项目,采用PPP模式进行投资、融资、建设、运营维护及移交。现将2018年度工程施工造价检查情况汇报如下: 按照相关专业规范要求、PPP项目合同、施工合同,根据施工进度要求,实施机构费县许家崖水库管理处、项目公司临沂清源工程建设运营有限公司、监理单位山东正直建设项目管理有限公司等单位对本年度施工单位山东临沂水利工程总公司承建的费县许家崖水库水源地生态保护工程PPP项目进行了现场施工进度情况、施工计划、施工计量资料、变更资料、签证资料等综合性检查。通过检查,本年度在建设期间监理、施工单位严格按照施工规范进行施工,对工程进度及造价控制良好,符合项目造价控制要求。 26.1
8b67684e12e049c392ecce0dc9547abb 2 2020-01-10 费县许家崖水库水源地生态保护工程PPP项目—水源地标准化建设、生态修复与保护、能力建设工程是经费县人民政府(费政字【2017】116号)批准的政府与社会资本方合作采购项目,采用PPP模式进行投资、融资、建设、运营维护及移交。现将2019年度工程施工造价检查情况汇报如下: 按照相关专业规范要求、PPP项目合同、施工合同,根据施工进度要求,实施机构费县许家崖水库管理处、项目公司临沂清源工程建设运营有限公司、监理单位山东正直建设项目管理有限公司等单位对本年度施工单位山东临沂水利工程总公司承建的费县许家崖水库水源地生态保护工程PPP项目进行了现场施工进度情况、施工计划、施工计量资料、变更资料、签证资料等综合性检查。通过检查,本年度在建设期间监理、施工单位严格按照施工规范进行施工,对工程进度及造价控制良好,符合项目造价控制要求。 26.1
401cfb28bc2b459cb929eef0ee3057fe 1 2018-12-20 符合要求 合同
e37c9cdfe5d34a3394ce00167a168de8 1 2020-07-28 符合 第三章项目的范围和期限第七条7.4
e2b75e4e6dda4f228f7690e1a736ea85 1 2019-07-10 瀚景项目管理公司决算审核报告 合同第7.16条款预结算编制依据
77a7f375796e4ecbac46ee2cfb19f08a 1 2020-08-31 控制在预算范围内 根据缙云县紫薇路北延伸工程PPP项目合同第5条项目前期工作第5.2前期费用和征地拆迁费用约定
7a0fd1f81d5f41978508960dd283fe63 1 2017-08-18 符合博州地区单价及信息单价 第26条

The annual operations of social capital or project companies and their operational performance standards

Note: This table only has one row of data

Project rid Serial number Year Annual performance evaluation completion time
c7381b4eccaf4602904f76234cfab28a 4 2017 2017-12-31

Financing amount, main financing conditions and financing delivery status

Project rid Serial number Name of financing institution Financing amount First withdrawal time Main Conditions
35d3ecd5b8a0434086eff1c5428158c2 1 China Construction Bank 4594510000 2018-12-26 Dongguan City Water Ecology Phase IV PPP Project requires temporary funds in the initial stage of construction. The loan period is 1 year and the interest rate is 4.35%.
35d3ecd5b8a0434086eff1c5428158c2 2 ICBC 4594510000 2018-12-24 Dongguan City Water Ecology Phase IV PPP Project requires temporary funds in the initial stage of construction. The loan period is 1 year and the interest rate is 4.35%.
35d3ecd5b8a0434086eff1c5428158c2 3 Rural Commercial Bank 4594510000 2018-12-25 Dongguan City Water Ecology Phase IV PPP Project requires temporary funds in the initial stage of construction. The loan period is 1 year and the interest rate is 4.35%.
35d3ecd5b8a0434086eff1c5428158c2 4 Dongguan Bank 4594510000 2018-12-25 Dongguan City Water Ecology Phase IV PPP Project requires temporary funds in the initial stage of construction. The loan period is 1 year and the interest rate is 4.35%.
35d3ecd5b8a0434086eff1c5428158c2 5 Bank of China 4594510000 2018-12-25 Dongguan City Water Ecology Phase IV PPP Project requires temporary funds in the initial stage of construction. The loan period is 3 years and the interest rate is 4.35%.
60f7a2182b5f4f10b49de603ece8cd8d Business Department of Agricultural Development Bank of China, Lijiang Branch
650bcd760c3a49b696735f6a1a0edb01 1 China Construction Bank 122390000 2018-12-26
650bcd760c3a49b696735f6a1a0edb01 2 ICBC 122390000 2018-12-24
650bcd760c3a49b696735f6a1a0edb01 3 Rural Commercial Bank 122390000 2018-12-25
650bcd760c3a49b696735f6a1a0edb01 4 Dongguan Bank 122390000 2018-12-25
650bcd760c3a49b696735f6a1a0edb01 5 Bank of China 122390000 2018-12-25
4e7ddb119bb44d58a6712a7965f54441 1 Agricultural Development Bank of China Guzhen County Branch 36455000000 2019-08-01
f69a7651918c480893b5f9821c5eaead 1 China Construction Bank Shenyang Huanggu Branch 7500000000 2019-10-14
0d416f30f33f42b6a61405acccc5f3d3 China Construction Bank Corporation Xingan Branch
fbb6d28f68e84182b84a7c201ba1a7f7 1 Agricultural Development Bank of China Hebei Yuanshi County Branch 60000000000 2019-06-20 China Fortune Land Development Co., Ltd. guarantees, Jiutong Foundation Investment Co., Ltd. guarantees, and Yuanshi Company pledges future accounts receivable of 1.245 billion under the PPP contract (the guarantee contract and the rights pledge contract have been signed and completed Pledge of accounts receivable).
fb649650cf974825b46991499dc69480 1
fb649650cf974825b46991499dc69480 Weifang Bank Co., Ltd. Changyi Branch
1589260a3f1e475b9ea79289fccdf994 1 Chenxi County Jinheng Environment 1422000000 2018-11-15 A loan of 14.22 million yuan is used for the Chenxi Huangxikou sewage treatment plant project. The loan period does not exceed 120 months, and the interest rate is negotiated on a single basis
9fd12f05d0fa47c3b82babc8ee4d3d10 1 Rudong County Branch of Agricultural Development Bank of China 97000000000 2019-09-19 Pledge of accounts receivable
bc1de8b2d7f04bc2bd1c9d81b24ad235 1 Bank of Beijing Co., Ltd. Zhongguancun Science and Technology Park Branch 8100000000 2017-12-26
26f6d3d7acd549b9a4b75c20d1323a2d Agricultural Development Bank of China Longhua County Branch
b91ea2ccbd73472392bbb68b64873c93 1 CITIC Bank Guiyang Branch 100000000000 2019-05-23 Credit Guarantee
2ad9ecd0cb884e528bbe14d9209b4abe 1 Chengbei Branch of Bank of Nanjing Co., Ltd. 1800000000 2019-04-26 Technology Loan
ab951150001f4706a2fe7529d4d95612 1 China Post Bank Wenling Branch 7000000000 2019-07-15
76f9e61fb6e94047b8378ec606e3b7e9 1 Industrial and Commercial Bank of China Co., Ltd. Chengdu Chunxi Branch 34900000000 2019-05-14 Pledge
005e8b0f5fa949a3a0a2af5cf07b75a4 1 Pingxiang Urban Construction Investment Development Company 75000000000 2017-12-19
c2585383c6c04f509aa0e1e688c071f4 1 Bank of China Co., Ltd. Hunan Xiangjiang New District Branch 0

Execution phase text file

Note: The names of the tables shown below are the same as the sample data fields, but the content is different. The sample data only shows the format.

Table name
The people's government at the same level authorizes the government investment representative
Relevant content of the project company’s financial report, including project charges and government subsidies received by the project
Project Construction License
Major disputes, litigation or arbitration involving the project or parties directly related to the project
Regulations and decisions made by the government at the same level or its functional departments that may have a significant impact on the project
Major changes or termination of the project
Major breach of contract and withdrawal of performance guarantee, etc.

Execution phase text file sample display

Project rid File name File PDF
0a2738c445ce4a24bb5222d4f3ec9d17 Construction project construction permit.jpg
c2147b0cb43c4885a25aa27212bc0ede 6 "Construction Project Construction License".pdf
c51b19d801064c32b775e68c0e736985 Building Project Construction Permit_20200409113126.pdf
650bcd760c3a49b696735f6a1a0edb01 15. Copy of sewage interception pipe network construction permit.pdf
650bcd760c3a49b696735f6a1a0edb01 14. Original copy of sewage interception pipe network construction permit.pdf
f69a7651918c480893b5f9821c5eaead 45. Construction permit-copy.pdf
3ff457a96a4b4730a95d46334ac43f60 Attachment 17 Construction Permit.pdf
fe0acdc025014012a8dea23ccdbaac31 Yuli project construction permit.pdf
1df8ce2f3be04b9a86d6f01a2ccf4d9b Hejing Project Construction Permit.pdf
b8c26edac2714b0ea82e86b079b62bfd Construction permit.pdf
1d77d179345246e8841f051971b64057 [Latest] PPP project construction permit.pdf
f1e9061f789346a385c23d7100dac788 Extension line of Galutu via Jiunan Road.pdf
f1e9061f789346a385c23d7100dac788 Garutu Boulevard (Sulige Street-Mu Us).pdf
f1e9061f789346a385c23d7100dac788 Garutu Hero Road (Buridu Street-Sulige Street).pdf
f1e9061f789346a385c23d7100dac788 Sulige Street Municipal Road Reconstruction (Dabchak-Renmin Road).pdf
f1e9061f789346a385c23d7100dac788 Sulige Street Extension Line.pdf
d18c17c22bf740d4a47d10460ecc1613 Construction License for Transfer of Operation Rights and Bid Upgrading and Renovation Project PPP Project of Shuangluan District Sewage Treatment Plant in Chengde City, Hebei Province.pdf
013ba2492a0840849a503561d74b17ff 6Construction Permit.pdf
10a801f47e5743249cd7c3f16b5a6d9f Construction permit 1.pdf
10a801f47e5743249cd7c3f16b5a6d9f Construction permit 2.pdf
10a801f47e5743249cd7c3f16b5a6d9f Sunshine School Project--Commencement Order.pdf
524f26410f214644bc21b23b8e3d8f76 No. 3 Middle School Construction Permit.pdf
e5dc514dde1d49e4b59c6ca9367ed832 Construction permit.pdf
f0eb77bf435b40209acf90ae047e26d6 320925201903150102-Jianhu County Transportation Bureau-Electronic license has been signed.pdf
3ec8107350ba45ecb6f0e95c975908c4 Construction Permit Phase 4.pdf
3ec8107350ba45ecb6f0e95c975908c4 Construction Permit Phase 4.pdf
42343a8f6d1e41eab7e060ca031e7d0d W001: Construction Project Construction Permit (original) (441900201803282502).pdf
8e1017fefb554332a649fad5cbf1b1bf Construction Permit for Baima Shigu Section.pdf
8e1017fefb554332a649fad5cbf1b1bf Construction Permit for the Second Bid Section.pdf

Related literature

  • Sun Mouxuan, Zhu Fangwei, 2022: "Research on the logical conflict of public-private systems and the cooperative behavior of social capital in PPP projects", "Nankai Management Review".
  • Zhang Muyang, Lu Xiaoqin, Wang Feng, 2019: "Can local finance bear the financial expenditure responsibility for PPP projects? ——Analysis based on PPP projects from 2010 to 2018", "Fiscal Research" No. 8.
  • Gong Qiang, Zhang Yilin, Lei Liheng, 2019: "Government-Social Capital Cooperation (PPP): The Theory of Public Goods Burden from the Perspective of Incomplete Contracts", "Economic Research" Issue 4.
  • Eva I. Hoppe and Patrick W. Schmitz, 2013, "Public-private partnerships versus traditional procurement: Innovation incentives and information gathering", The RAND Journal of Economics.

Data update frequency

Annual Update

文件下载